Planning register

Planning Application - 23/01608/DISC

Skip to tab headings. Skip to tab content.

Application Number
23/01608/DISC
Application Type
Discharge Of Conditions
Status
Application Permitted
Decision Level
Delegated
Location
Proposed Himley Village North West Bicester Middleton Stoney Road Bicester
Proposal
PARTIAL DISCHARGE of Conditions 13 (Future Climate Change Risks Statement) and 36 (Water Neutrality Statement) of 14/02121/OUT (as amended by 22/03492/NMA) for Phase 2A
Parish
Bucknell
Ward
Fringford And Heyfords
Received Date
13/06/2023
Valid Date
13/06/2023
Weekly List Date
15/06/2023
Comments Due Date
21/07/2023
Target Decision Date
22/02/2024
Committee Date
Decision
Permitted
Decision Issued Date
25/07/2024
Appeal Received Date
Appeal Start Date
Appeal Decision
Appeal Decision Date
Applicant
Cala Homes (Cotswolds) Ltd
Applicant's Address
Miss Becky Pull 2nd Floor, Building One Oxford Technology Park Technology Drive Kidlington OX5 1GN
Agent
Agents's Address

Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.


Neighbour List
No associated neighbours

Consultee List
Name Address Consult Date Reply Due Reply Received Type
NameWard Councillor - Bicester North And Caversfield Address Consult Date15/06/2023 Reply Due06/07/2023 Reply Received TypeStandard Consultee
NameWard Councillor - Fringford And Heyfords Address Consult Date15/06/2023 Reply Due06/07/2023 Reply Received TypeStandard Consultee
Public Notices
Description Display Date Expiry Date Notice Type
DescriptionSite Notice Display Date21/06/2023 Expiry Date21/07/2023 Notice Type

To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.

Document Type Date Description File Size Drawing/Rev Number
Application Forms
Application Documents 13/06/2023 App Form (156kb) -
Application Documents 13/06/2023 Cover Letter (153kb) -
Supporting Documents
Supporting Documents 19/03/2024 Energy Strategy Addendum P02.pdf (519kb) -
Supporting Documents 15/05/2024 Construction Process Carbon Emissions P02 AMENDED (3208kb) -
Supporting Documents 19/06/2024 AMD Water Neutrality Statement Phase 2A P03 (1728kb) -
Supporting Documents 09/07/2024 AMD Future Climate Change Statement P04 Phase 2A (1494kb) -
Supporting Documents 09/07/2024 AMD Water Neutrality Statement P03 Phase 2A (1728kb) -
Consultee Responses
Consultation Response 10/11/2023 Bioregional response (14907kb) -
Consultation Response 19/04/2024 Bioregional response to Energy Strategy Addendum.pdf (402kb) -
Consultation Response 14/06/2024 Bioregional response to updated Hydrock docs (65kb) -
Consultation Response 26/06/2024 Bioregional Comments On Water Neutrality (908kb) -
Officer/Committee Consideration
Officer Report 25/07/2024 FINAL Delegated Officer Report (18kb) -
Decision and Legal Agreements
Decision 25/07/2024 FINAL Decision Notice (155kb) -
Planning Application Documents
Superseded 13/06/2023 SUPP Future Climate Change Statement (2684kb) -
Superseded 13/06/2023 SUPP Construction Process Carbon Emissions (3907kb) -
Superseded 13/06/2023 SUPP Water Neutrality Statement (752kb) -
Superseded 15/05/2024 SUPP Future Climate Change Statement P03.02 (2689kb) -
Superseded 15/05/2024 SUPP Water Neutrality Statement P02 (1627kb) -
Application Forms
Application Documents (156kb) - App Form
Application Documents (153kb) - Cover Letter
Supporting Documents
Supporting Documents (519kb) - Energy Strategy Addendum P02.pdf
Supporting Documents (3208kb) - Construction Process Carbon Emissions P02 AMENDED
Supporting Documents (1728kb) - AMD Water Neutrality Statement Phase 2A P03
Supporting Documents (1494kb) - AMD Future Climate Change Statement P04 Phase 2A
Supporting Documents (1728kb) - AMD Water Neutrality Statement P03 Phase 2A
Consultee Responses
Consultation Response (14907kb) - Bioregional response
Consultation Response (402kb) - Bioregional response to Energy Strategy Addendum.pdf
Consultation Response (65kb) - Bioregional response to updated Hydrock docs
Consultation Response (908kb) - Bioregional Comments On Water Neutrality
Officer/Committee Consideration
Officer Report (18kb) - FINAL Delegated Officer Report
Decision and Legal Agreements
Decision (155kb) - FINAL Decision Notice
Planning Application Documents
Superseded (2684kb) - SUPP Future Climate Change Statement
Superseded (3907kb) - SUPP Construction Process Carbon Emissions
Superseded (752kb) - SUPP Water Neutrality Statement
Superseded (2689kb) - SUPP Future Climate Change Statement P03.02
Superseded (1627kb) - SUPP Water Neutrality Statement P02
Addresses
Proposed Himley Village North West Bicester Middleton Stoney Road Bicester

Planning Applications

Application number Valid Date Application Type Location Proposal Decision Decision Issued Date
14/02121/OUT 31/12/2014 Outline Application Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Oxfordshire OUTLINE - Development to provide up to 1,700 residential dwellings (Class C3), a retirement village (Class C2), flexible commercial floorspace (Classes A1, A2, A3, A4, A5, B1, C1 and D1), social and community facilities (Class D1), land to accommodate one energy centre and land to accommodate one new primary school (up to 2FE) (Class D1). Such development to include provision of strategic landscape, provision of new vehicular, cycle and pedestrian access routes, infrastructure and other operations (including demolition of farm buildings on Middleton Stoney Road) Permitted 30/01/2020
14/00102/SO 31/12/2014 Screening Opinion Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Oxfordshire Development to provide up to 1,700 residential dwellings (Class C3), a retirement village (Class C2), flexible commercial floorspace (Classes A1, A2, A3, A4, A5, B1 and C1), social and community facilities (Class D1), land to accommodate one energy centre and land to accommodate one new primary school (up to 2FE) (Class D1). Such development to include provision of strategic landscape, provision of new vehicular, cycle and pedestrian access routes, infrastructure and other operations (including demolition of farm buildings on Middleton Stoney Road) Screening Opinion requesting EIA 31/12/2014
21/02229/OBL 23/06/2021 Obligation Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Discharge of Schedule 3 Clause 1.1 (exact location and boundaries for Pitch Area 1), Schedule 7 Clause 8.1 (location of the Health Facility Site), Schedule 9 Clause 1.1 and 1.3 (Framework Affordable Housing Scheme and Phase Affordable Housing Scheme), Schedule 11 Clauses 1.1 and 1.3 (Zero Carbon Implementation Strategy), Schedule 12 Clause 1.1 (cultural wellbeing strategy) and Schedule 14 clause 3.1 (location of the allotment land and the phases of the development this fits within), 3.8 (Green Space Framework), 3.10 (Phase Green Space Scheme) and 3.14 (Phase Play Area Scheme) of the S106 Agreement attached to the outline permission 14/02121/OUT Application Withdrawn 03/11/2022
21/02337/DISC 05/07/2021 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Oxfordshire Discharge of condition 7 (phasing plan) 8 (site wide Masterplan and Design Code) 10 (Bio Diversity Strategy) 11 (full surface water drainage scheme) 12 (Built for Life scheme) 13 (future climate impacts statement) 14 (elevated levels of noise) 16 (means of vehicular accesses) 17 (means of footway and cycleway links) 18 (Travel Plan) 19 (detailed surface water drainage scheme) 20 (carbon emissions report) 21 (potential contaminative uses) 22 (comprehensive intrusive investigation) 24 (pollution prevention scheme) 25 (ecological survey) 26 (hedgerows) 27 (Arboricultural Method Statement (AMS)) 28 (Great Crested Newt mitigation strategy) 29 (Landscape & Habitat Management Plan) 30 (Construction Method Statement) 31 (Soil Resources Plan) 32 (archaeological Written Scheme of Investigation) 33 (programme of archaeological evaluation) 34 (foul drainage strategy) 36 (water neutrality strategy) and 37 (Site Waste Management Plan) of 14/02121/OUT Application Withdrawn 03/11/2022
21/02339/REM 22/07/2021 Matters Arising From Outline Approval Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Reserved Matters application for 14/02121/OUT, Phase 1 Development of 500 dwellings, landscaping, new vehicular, cycle and pedestrian access routes and other operations Application Withdrawn 03/11/2022
21/02387/M106 09/07/2021 Application to Modify a Section 106 Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Modification of Section 106 (14/02121/OUT) to amend the mortgagee exclusion clause in Schedule 9, deletion of definition of chargee and to exclude the RP's Lender and the RP itself from liability for the estate wide contributions and obligations Application Withdrawn 03/11/2022
22/01990/CCE 04/07/2022 Compliance with Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Confirmation of Compliance of discharge conditions 2 (expiration date) of 14/02121/OUT Agreed 02/09/2022
22/02375/NMA 05/08/2022 Non Material Amendments Proposed Himley Village North West Bicester Middleton Stoney Road Bicester To change the wording of Conditions 7-11 of application reference 14/02121/OUT to include 'Prior to or alongside the submission of the first application for approval of reserved matters' in place of the words 'Prior to the submission of the first reserved matters' on each of the noted conditions and update to the relevant condition title. (Proposed as non-material amendment to 14/02121/OUT) Permitted 02/09/2022
22/03492/NMA 21/11/2022 Non Material Amendments Proposed Himley Village North West Bicester Middleton Stoney Road Bicester To change the wording of Conditions 2, 4, 7, 8, 9, 10, 11, 13, 14, 18 and 36 :- - Remove the requirement for the first phase RM application to be a "Residential" RM (Condition 2) - To tie commencement of development to the first phase of the development rather than the first "Residential" phase (condition 4) - Change the timing of the submission of details required to discharge conditions 7, 8, 9, 10, 11, 13, 14, 18 and 36 - To allow subsequent variations to any approved Phasing Plan to be submitted to and approved by the LPA (Condition 7) (proposed as non-material amendment to 14/02121/OUT) Permitted 19/12/2022
23/00170/REM 23/01/2023 Matters Arising From Outline Approval Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Reserved Matters Application pursuant to outline planning permission 14/02121/OUT for Phase 1A (infrastructure comprising two junctions to provide vehicular and pedestrian access into the site from Middleton Stoney Road and two initial sections of internal road) along with the partial compliance of conditions 12 (Building for Life 12), 16 (means of vehicular access), 17 (means of pedestrian/cycle links) and 19 (detailed surface water drainage scheme) for Phase 1A. Permitted 27/02/2024
23/00214/REM 24/01/2023 Matters Arising From Outline Approval Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Reserved Matters Application pursuant to outline planning permission 14/02121/OUT for Phase 1A (infrastructure comprising two junctions to provide vehicular and pedestrian access into the site from Middleton Stoney Road and two initial sections of internal road) along with the partial compliance of conditions 12 (Building for Life 12), 16 (means of vehicular access), 17 (means of pedestrian/cycle links) and 19 (detailed surface water drainage scheme) for Phase 1A. Permitted 27/02/2024
23/00183/DISC 23/01/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 20 (Carbon Emissions) and Condition 30 (CEMP) of 14/02121/OUT for Phase 1 only (accesses from Middleton Stoney Road) Application Withdrawn 18/06/2024
23/00207/DISC 24/01/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Discharge of Conditions 7 (site wide Phasing Plan), 11 (full surface Water Drainage Scheme) and 10 (Site Wide Biodiversity Strategy) of 14/02121/OUT (as amended by 22/03492/NMA) Permitted 21/02/2024
23/00781/DISC 22/03/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 32 (Written Scheme of Investigation) of 14/02121/OUT for Phases 1, 2 and a small part of Phase 3 as per Phasing Plan P22-3093_DE_5_B_1 Permitted 19/05/2023
23/01493/REM 07/06/2023 Matters Arising From Outline Approval Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Reserved Matters Application including access, layout, landscaping and scale pursuant to outline planning permission 14/02121/OUT for internal primary and secondary streets along with the partial discharge of conditions 12 (Building for Life 12), 16 (means of vehicular access), 17 (means of pedestrian/cycle links) and 19 (detailed surface water drainage scheme) for Phase 1B Permitted 08/07/2024
23/01496/DISC 02/06/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Discharge of Condition 8 (Site Wide Masterplan and Design Code) of 14/02121/OUT (as amended by 22/03492/NMA) Permitted 14/11/2024
23/01502/DISC 02/06/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 20 (Carbon Emissions) of 14/02121/OUT - for Phases 1A, 1B and 2A Permitted 25/07/2024
23/01558/DISC 08/06/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Discharge of Condition 9 (other uses area masterplan) of 14/02121/OUT
23/01586/REM 16/06/2023 Matters Arising From Outline Approval Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Reserved Matters Application pursuant to Outline planning permission 14/02121/OUT for the erection of 123 dwellings (including 37 affordable dwellings), parking, landscaping and other associated infrastructure including the part compliance of conditions 12 (Building for Life 12), 14 (noise assessment), 16 (means of vehicular access), 17 (means of pedestrian/cycle links) and 19 (detailed surface water drainage scheme) at Phase 2A Permitted 20/11/2024
23/01608/DISC 13/06/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Conditions 13 (Future Climate Change Risks Statement) and 36 (Water Neutrality Statement) of 14/02121/OUT (as amended by 22/03492/NMA) for Phase 2A Permitted 25/07/2024
23/02029/DISC 24/07/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL Discharge of Condition 27 (Arboricultural Method Statement) for Phase 1A (accesses) of 14/02121/OUT Permitted 26/10/2023
23/02786/OBL 09/10/2023 Obligation Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Submission of a Zero Carbon Strategy in accordance with paragraph 1.1 of Schedule 11 of the Section 106 agreement dated 30th January 2020 relating to planning permission 14/02121/OUT
23/03546/DISC 19/12/2023 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL Discharge of Condition 29 (Landscape and Habitat Management Plan) of 14/02121/OUT (Phase 2A Only) Permitted 14/06/2024
24/00615/DISC 05/03/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL Discharge of Condition 30 (Construction Environmental Management Plan) of 14/02121/OUT (Phase 2 only) Permitted 02/08/2024
24/01036/DISC 17/04/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 21 (Contamination Desk Study) of 14/02121/OUT (PART of Phases 1 and 2 only) Permitted 12/06/2024
24/01041/DISC 17/04/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 22 (Contamination - Intrusive Investigation) of 14/02121/OUT (PART Phases 1 and 2 only) Permitted 12/06/2024
24/01214/DISC 02/05/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Partial Discharge of Condition 31 (Soil Resources Plan) of 14/02121/OUT for Phase 2 only Permitted 25/07/2024
24/01241/DISC 07/05/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Partial discharge of Condition 24 (Pollution Prevention Plan) of 14/02121/OUT - for Phases 1 and 2 only Permitted 16/08/2024
24/01261/OBL 07/05/2024 Obligation Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Discharge/discussion of Schedule 3 (Sports Pitches); Schedule 4 (Community Buildings); Schedule 6 (Community Development); Schedule 7 (Non-Residential Uses including location of health facility site); Schedule 8 (Training and Employment Plan), Schedule 14 (Open Space, Allotments and Drainage); Schedule 17 (County Council Contributions); and Schedule 20 (Strategic Infrastructure) of the S106 Agreement attached to the outline permission 14/02121/OUT
24/01426/DISC 24/05/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Phases 1A, 1B and 2A Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 37 (Site Waste Management Plan) for Phases 1A, 1B and 2A only of 14/02121/OUT Permitted 16/08/2024
24/01603/DISC 13/06/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 25 (Phase Ecological Survey Update) of 14/02121/OUT for Phases 1A, 1B and 2A Permitted 25/11/2024
24/01604/DISC 13/06/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Discharge of Condition 26 (Hedgerow Removal Details) of 14/02121/OUT
24/01605/DISC 13/06/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 34 (Foul Drainage Strategy) of 14/02121/OUT for Phases 1A & 1B Permitted 06/09/2024
24/01671/NMA 20/06/2024 Non Material Amendments Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Oxfordshire OX26 1RT Non-material amendment to 14/02121/OUT - Alterations to the description of development to remove references to former use classes and replace these with the appropriate current use classes. Alterations to the approved Land Use Parameter Plan to remove references to former use classes and replace these with the appropriate current use classes. Alterations to Condition 5 to update the reference to the latest revision of the 'Land Use - Parameter Plan 4'. Alterations to Condition 8 to update the reference to the latest revision of the 'Land Use - Parameter Plan 4'. Alterations to Condition 9 to update the reference to the latest revision of the 'Land Use - Parameter Plan 4'. Alterations to Condition 44 to remove references to former use classes and replace these with the appropriate current use classes and to update the reference to the latest revision of the 'Land Use - Parameter Plan 4'. Alterations to Condition 45 to remove references to former use classes and replace these with the appropriate current use classes
24/01668/DISC 20/06/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 29 (Landscape and Habitat Management Plan) of 14/02121/OUT for Phases 1A and 1B only
24/01669/DISC 20/06/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Discharge of Condition 28 (Great Crested Newt Strategy) of 14/02121/OUT Permitted 12/08/2024
24/01801/DISC 04/07/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of condition 27 (Arboricultural Method Statement) of 14/02121/OUT for Phase 1B only
24/01967/MISC 22/07/2024 Miscellaneous Enquiries Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Proposal to grant a variation of appointment to Advanced Water Infrastructure Networks Limited, to allow it to supply Water and Sewerage services No Further Action 27/11/2024
24/02249/NMA 16/08/2024 Non Material Amendments Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Non-material amendment to 23/01493/REM - rewording of condition 3 (Great Crested Newt Licence) Permitted 13/09/2024
24/02273/DISC 19/08/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 27 (Phase Arboricultural Method Statement) of 14/02121/OUT for Phase 2A
24/02981/DISC 05/11/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Discharge of Condition 6 (Foul Water Pumping Station Details) of 23/01493/REM
24/03010/M106 07/11/2024 Application to Modify a Section 106 Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Modification of Section 106 (14/02121/OUT): To amend the Mortgagee in Possession clause to ensure the Affordable Housing Units can be charged at MVST; to insert an enforceability clause which removes liability from the RP and RP Mortgagee in respect of the non-AH obligations; amend the exclusions clause so that the Affordable housing provisions will not apply to mortgagees, successors in title (and their mortgagees and successors in title) of the protected parties; to insert a provision which would allow the rents on Affordable Rented Units to be increased by CPI + 1% per annum; to insert a provision which would allow the rents on Shared Ownership Units to be increased by RPI + 0.5% per annum
24/03062/DISC 14/11/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 34 (foul drainage strategy) of 14/02121/OUT for Phase 2A
24/03110/DISC 19/11/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester PARTIAL DISCHARGE of Condition 18 (Travel Plan) of 14/02121/OUT for Phase 2A
24/03156/NMA 22/11/2024 Non Material Amendments Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Non-material amendment to 23/01586/REM - Plot 1 – gate location moved to other side of house and a path has been added to the front garden for access to the rear gate. Plot 4 – gate location moved to other side of house and the path that was in the front garden has now been removed and put back to grass as the gate opens on to the driveway meaning there is now no need for this path. Plot 81 – gate location is now shown as was not shown on previous revisions. Plots 82 and 83 – parking space and twin garage label has been swapped.
24/03189/DISC 28/11/2024 Discharge Of Conditions Proposed Himley Village North West Bicester Middleton Stoney Road Bicester Part Discharge of Condition 2 (facing and roofing materials) of 23/01586/REM - roofing materials only

Building Control Applications

Application number Received Date Validated Date Application Type Location Proposal
22/00291/IN 09/03/2022 Initial Notice Proposed Himley Village North West Bicester Middleton Stoney Road Bicester 950 residential unit(s)
24/00725/IN 19/07/2024 Initial Notice Proposed Himley Village North West Bicester Middleton Stoney Road Bicester 500 residential units.

Back to top.