Track this application
Application Number 17/00524/F |
Application Type Full Development |
Status Application Permitted |
Decision Level Delegated |
Location 4th D Landscape Services
Canal Road
Thrupp
Kidlington
OX5 1JZ |
|
Proposal Conversion of two existing storage buildings into three residential dwellings (C3 Use Class) and associated works (including the demolition of an existing agricultural barn) |
|
Parish Shipton On Cherwell And Thrupp |
Ward Launton And Otmoor |
Received Date 07/03/2017 |
Valid Date 29/03/2017 |
Weekly List Date |
Comments Due Date 04/05/2017 |
Target Decision Date 14/07/2017 |
Committee Date |
Decision Permitted |
Decision Issued Date 14/07/2017 |
Appeal Received Date |
Appeal Start Date |
Appeal Decision |
Appeal Decision Date |
Applicant Worton Park |
Applicant's Address c/o Agent |
Agent
Strutt And Parker
|
Agents's Address
Mr Simon Handy
269 Banbury Road
Oxford
OX2 7LL
|
Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.
Neighbour List
Address | Consult Date | Reply Due | Reply Received | Re-Consult Date | Reply Due | Reply Date |
---|---|---|---|---|---|---|
AddressBodicote House White Post Road Bodicote Oxfordshire OX15 4AA | Consult Date | Reply Due | Reply Received18/04/2017 | Re-Consult Date | Reply Due | Reply Date18/04/2017 |
Address5 Canal Road Thrupp Kidlington OX5 1LD | Consult Date | Reply Due | Reply Received20/04/2017 | Re-Consult Date | Reply Due | Reply Date20/04/2017 |
AddressStone Barn Canal Road Thrupp Kidlington OX5 1JQ | Consult Date | Reply Due | Reply Received23/04/2017 | Re-Consult Date | Reply Due | Reply Date23/04/2017 |
AddressThe Coach House Canal Road Thrupp Kidlington OX5 1JY | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThrupp Canal Cruise Club Canal Yard Canal Road Thrupp Banbury OX5 1JZ | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressBritish Waterways Board Canal Yard Canal Road Thrupp Kidlington OX5 1JZ | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThe Manor Farm House Canal Road Thrupp Kidlington OX5 1JY | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThe Dovecote 10 Canal Road Thrupp Kidlington OX5 1LD | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThe Annexe The Coach House Canal Road Thrupp Kidlington OX5 1JY | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressAnnies Traditional Tea Marquee Canal Yard Canal Road Thrupp Kidlington OX5 1JZ | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressNarrowboat Doris Canal Yard Canal Road Thrupp Kidlington OX5 1JZ | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressAnnies Tea Room Canal Yard Canal Road Thrupp Kidlington OX5 1JZ | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
Consultee List
Name | Address | Consult Date | Reply Due | Reply Received | Type |
---|---|---|---|---|---|
NameArchaeology (OCC) | Address | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received12/04/2017 | TypeStandard Consultee |
NameCanal And River Trust | AddressStrategy, Planning & Design Fradley Junction Alrewas Burton-on-Trent Staffordshire DE13 7DN | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received24/04/2017 | TypeStandard Consultee |
NameConservation (CDC) | Address | Consult Date05/04/2017 | Reply Due19/04/2017 | Reply Received24/05/2017 | TypeStandard Consultee |
NameEcology (CDC) | Address | Consult Date05/04/2017 | Reply Due19/04/2017 | Reply Received13/04/2017 | TypeStandard Consultee |
NameEnvironment Agency | AddressRed Kite House Howbery Park Crowmarsh Gifford WALLINGFORD OX10 8BD | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received17/05/2017 | TypeStandard Consultee |
NameEnvironmental Health (CDC) | Address | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received20/04/2017 | TypeStandard Consultee |
NameLead Local Flood Authority OCC Drainage | Address | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | TypeStandard Consultee |
NameLocal Highways Authority OCC | Address | Consult Date05/04/2017 | Reply Due19/04/2017 | Reply Received06/06/2017 | TypeStandard Consultee |
NameRights Of Way (OCC) | Address | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | TypeStandard Consultee |
NameShipton On Cherwell And Thrupp Parish Council | Address12 The Slade Silverstone NN12 8UH | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | TypeStandard Consultee |
NameThames Water | AddressDevelopment Planning Asset Investment Unit Maple Lodge Denham Way RICKMANSWORTH WD3 9SQ | Consult Date05/04/2017 | Reply Due26/04/2017 | Reply Received | TypeStandard Consultee |
NameIan Upstone (Waste And Recycling Manager) - Waste & Recycling (CDC) | Address | Consult Date05/04/2017 | Reply Due19/04/2017 | Reply Received | TypeStandard Consultee |
Description | Display Date | Expiry Date | Notice Type |
---|---|---|---|
DescriptionSite Notice General | Display Date13/04/2017 | Expiry Date04/05/2017 | Notice Type |
DescriptionBicester Advertiser | Display Date13/04/2017 | Expiry Date04/05/2017 | Notice Type |
To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.
Document Type | Date | Description | File Size | Drawing/Rev Number | |
---|---|---|---|---|---|
Application Forms | |||||
Application Document | 05/04/2017 | Publicity | (0kb) | - | |
Application Document | 29/03/2017 | Checklist | (0kb) | - | |
Application Document | 20/07/2017 | site visit | (0kb) | - | |
Application Document | 30/03/2017 | App form | (0kb) | - | |
Application Document | 15/03/2017 | Constraints | (0kb) | - | |
Application Document | 15/03/2017 | Info/Species Map | (0kb) | - | |
Application Document | 15/03/2017 | Neighbour Map | (0kb) | - | |
Application Document | 15/03/2017 | Neighbour List | (0kb) | - | |
Supporting Documents | |||||
Flood Risk Assessment | 05/07/2017 | AMD Flood Risk Assessment | (0kb) | - | |
Photographs | 07/04/2017 | Site Notice | (0kb) | - | |
Photographs | 07/04/2017 | Site Notice | (0kb) | - | |
Supporting Documents | 30/03/2017 | Design & Access statement | (0kb) | - | |
Supporting Documents | 30/03/2017 | Ecological Assessment | (0kb) | - | |
Supporting Documents | 30/03/2017 | Hydraullic Modelling Report | (0kb) | - | |
Supporting Documents | 30/03/2017 | Statement of Significance | (0kb) | - | |
Supporting Documents | 30/03/2017 | Planning statement | (0kb) | - | |
Site Plans | |||||
Plans – Block Plan/Site Layout | 05/07/2017 | AMD Site Layout | (0kb) | - | |
Site Location Plan | 30/03/2017 | Location plan | (0kb) | - | |
Existing Plans | |||||
Plans – Sections/Surveys | 30/03/2017 | Survey | (0kb) | - | |
Proposed Plans | |||||
Plans – Floor Plans/Elevations | 30/03/2017 | NE elevation | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | SE elevation | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | NW elevation | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | SW courtyard elevation | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | NW courtyard elevation | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | SE courtyard elevation | (0kb) | - | |
Plans – Floor Plans/Elevations | 05/07/2017 | AMD GF Plan Units 2&3 | (0kb) | - | |
Plans – Floor Plans/Elevations | 05/07/2017 | AMD GF Plan Unit 1 | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | Existing elevations 2 of 2 | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | Existing elevation 1 of 2 | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | Existing building with new biomass boiler | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | Existing building with new biomass boiler | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | FF Units 2&3 | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | Existing FF Plan | (0kb) | - | |
Plans – Floor Plans/Elevations | 30/03/2017 | Existing GF plan | (0kb) | - | |
Plans – Details | 30/03/2017 | Biomass Boiler specification | (0kb) | - | |
Consultee Responses | |||||
Consultation Response | 19/04/2017 | Waste and Recycling - 18.04.17 | (0kb) | - | |
Consultation Response | 04/07/2017 | Environment Agency comments 29/06/17 | (0kb) | - | |
Consultation Response | 06/06/2017 | OCC Highways 6/6/17 | (0kb) | - | |
Consultation Response | 25/05/2017 | CDC Conservation - 24.05.17 | (0kb) | - | |
Consultation Response | 17/05/2017 | Environment Agency comments 12/05/17 | (0kb) | - | |
Consultation Response | 25/04/2017 | Canal and River Trust - 24.04.17 | (0kb) | - | |
Consultation Response | 20/04/2017 | Environmental Protection - 20.04.17 | (0kb) | - | |
Consultation Response | 18/04/2017 | CDC Ecology - 13.04.17 | (0kb) | - | |
Consultation Response | 12/04/2017 | OCC Archaeology - 12.04.17 | (0kb) | - | |
Consultation Response | 26/05/2017 | Enviroment Agency - 26.05.17 | (0kb) | - | |
Public Comments | |||||
Public Comments | 26/04/2017 | Morton, Mrs Sysan - 23.04.17 | (0kb) | - | |
Public Comments | 21/04/2017 | Brading, K - 20.04.17 | (0kb) | - | |
Officer/Committee Consideration | |||||
Officer Report | 14/07/2017 | 14.07.17 | (0kb) | - | |
Decision and Legal Agreements | |||||
Decision | 14/07/2017 | 14.07.17 | (0kb) | - | |
Planning Application Documents | |||||
Superseded | 30/03/2017 | SUPP GF Units 2&3 | (0kb) | - | |
Superseded | 30/03/2017 | SUPP GF Unit 1 | (0kb) | - | |
Superseded | 30/03/2017 | SUPP Site layout | (0kb) | - | |
Superseded | 30/03/2017 | SUPP Flood risk Assessment | (0kb) | - |
Application Forms | |||||
---|---|---|---|---|---|
Application Document (0kb) - Publicity | |||||
Application Document (0kb) - Checklist | |||||
Application Document (0kb) - site visit | |||||
Application Document (0kb) - App form | |||||
Application Document (0kb) - Constraints | |||||
Application Document (0kb) - Info/Species Map | |||||
Application Document (0kb) - Neighbour Map | |||||
Application Document (0kb) - Neighbour List | |||||
Supporting Documents | |||||
Flood Risk Assessment (0kb) - AMD Flood Risk Assessment | |||||
Photographs (0kb) - Site Notice | |||||
Photographs (0kb) - Site Notice | |||||
Supporting Documents (0kb) - Design & Access statement | |||||
Supporting Documents (0kb) - Ecological Assessment | |||||
Supporting Documents (0kb) - Hydraullic Modelling Report | |||||
Supporting Documents (0kb) - Statement of Significance | |||||
Supporting Documents (0kb) - Planning statement | |||||
Site Plans | |||||
Plans – Block Plan/Site Layout (0kb) - AMD Site Layout | |||||
Site Location Plan (0kb) - Location plan | |||||
Existing Plans | |||||
Plans – Sections/Surveys (0kb) - Survey | |||||
Proposed Plans | |||||
Plans – Floor Plans/Elevations (0kb) - NE elevation | |||||
Plans – Floor Plans/Elevations (0kb) - SE elevation | |||||
Plans – Floor Plans/Elevations (0kb) - NW elevation | |||||
Plans – Floor Plans/Elevations (0kb) - SW courtyard elevation | |||||
Plans – Floor Plans/Elevations (0kb) - NW courtyard elevation | |||||
Plans – Floor Plans/Elevations (0kb) - SE courtyard elevation | |||||
Plans – Floor Plans/Elevations (0kb) - AMD GF Plan Units 2&3 | |||||
Plans – Floor Plans/Elevations (0kb) - AMD GF Plan Unit 1 | |||||
Plans – Floor Plans/Elevations (0kb) - Existing elevations 2 of 2 | |||||
Plans – Floor Plans/Elevations (0kb) - Existing elevation 1 of 2 | |||||
Plans – Floor Plans/Elevations (0kb) - Existing building with new biomass boiler | |||||
Plans – Floor Plans/Elevations (0kb) - Existing building with new biomass boiler | |||||
Plans – Floor Plans/Elevations (0kb) - FF Units 2&3 | |||||
Plans – Floor Plans/Elevations (0kb) - Existing FF Plan | |||||
Plans – Floor Plans/Elevations (0kb) - Existing GF plan | |||||
Plans – Details (0kb) - Biomass Boiler specification | |||||
Consultee Responses | |||||
Consultation Response (0kb) - Waste and Recycling - 18.04.17 | |||||
Consultation Response (0kb) - Environment Agency comments 29/06/17 | |||||
Consultation Response (0kb) - OCC Highways 6/6/17 | |||||
Consultation Response (0kb) - CDC Conservation - 24.05.17 | |||||
Consultation Response (0kb) - Environment Agency comments 12/05/17 | |||||
Consultation Response (0kb) - Canal and River Trust - 24.04.17 | |||||
Consultation Response (0kb) - Environmental Protection - 20.04.17 | |||||
Consultation Response (0kb) - CDC Ecology - 13.04.17 | |||||
Consultation Response (0kb) - OCC Archaeology - 12.04.17 | |||||
Consultation Response (0kb) - Enviroment Agency - 26.05.17 | |||||
Public Comments | |||||
Public Comments (0kb) - Morton, Mrs Sysan - 23.04.17 | |||||
Public Comments (0kb) - Brading, K - 20.04.17 | |||||
Officer/Committee Consideration | |||||
Officer Report (0kb) - 14.07.17 | |||||
Decision and Legal Agreements | |||||
Decision (0kb) - 14.07.17 | |||||
Planning Application Documents | |||||
Superseded (0kb) - SUPP GF Units 2&3 | |||||
Superseded (0kb) - SUPP GF Unit 1 | |||||
Superseded (0kb) - SUPP Site layout | |||||
Superseded (0kb) - SUPP Flood risk Assessment |
Addresses |
---|
Adjacent The Coach House Canal Road Thrupp |
4Th D Landscape Services 4Th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ |
Planning Applications | ||||||
Application number | Valid Date | Application Type | Location | Proposal | Decision | Decision Issued Date |
---|---|---|---|---|---|---|
16/01747/F | 26/08/2016 | Full Development | 4th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ | Demolition of an existing agricultural barn and alterations to and conversion of two existing storage buildings into three residential dwellings (Resubmission of 15/02075/F). | Refused | 09/12/2016 |
15/02075/F | 13/11/2015 | Full Development | 4th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ | Alterations and extensions to two existing storage buildings (Class B8 Use) and conversion to form three residential dwellings (C3 Use Class) and associated works (including the demolition of an existing agricultural barn) | Refused | 08/01/2016 |
17/00524/F | 29/03/2017 | Full Development | 4th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ | Conversion of two existing storage buildings into three residential dwellings (C3 Use Class) and associated works (including the demolition of an existing agricultural barn) | Permitted | 14/07/2017 |
19/00077/DISC | 06/03/2019 | Discharge Of Conditions | 4th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ | Discharge of Conditions 4 (surface water drainage), 5 (desk study and site walk over), 6 (intrusive investigation), 7 (remediation scheme), 10 (biodiversity method statement), 12 (timber cladding samples) 13 (stone sample panel), 14 (design details), 15 (protective fencing), 17 (landscaping scheme), 19 (car parking plan) and 22 (amended details of front courtyard) of 17/00524/F | Permitted | 11/07/2019 |
Building Control Applications | ||||||
Application number | Received Date | Validated Date | Application Type | Location | Proposal | |
---|---|---|---|---|---|---|
18/01109/OTHFPD | 01/10/2018 | 05/10/2018 | Full Plans (Domestic/Estimated Cost) | Canal Road Thrupp Kidlington OX5 1JZ | Conversion of two existing storage buildings into three residential dwellings and associated works |