Track this application
Application Number 16/01747/F |
Application Type Full Development |
Status Application Refused |
Decision Level Delegated |
Location 4th D Landscape Services
Canal Road
Thrupp
Kidlington
OX5 1JZ |
|
Proposal Demolition of an existing agricultural barn and alterations to and conversion of two existing storage buildings into three residential dwellings (Resubmission of 15/02075/F). |
|
Parish Shipton On Cherwell And Thrupp |
Ward Launton And Otmoor |
Received Date 26/08/2016 |
Valid Date 26/08/2016 |
Weekly List Date |
Comments Due Date 13/10/2016 |
Target Decision Date 09/12/2016 |
Committee Date |
Decision Refused |
Decision Issued Date 09/12/2016 |
Appeal Received Date |
Appeal Start Date |
Appeal Decision |
Appeal Decision Date |
Applicant Worton Park |
Applicant's Address C/o Agent
Strutt And Parker
Mr Simon Handy
269 Banbury Road
Oxford
OX2 7LL |
Agent
Strutt And Parker
|
Agents's Address
Mr Simon Handy
269 Banbury Road
Oxford
OX2 7LL
|
Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.
Neighbour List
Address | Consult Date | Reply Due | Reply Received | Re-Consult Date | Reply Due | Reply Date |
---|---|---|---|---|---|---|
AddressBodicote House White Post Road Bodicote Oxfordshire OX15 4AA | Consult Date | Reply Due | Reply Received15/09/2016 | Re-Consult Date | Reply Due | Reply Date15/09/2016 |
AddressCanal Lodge Street From Banbury Road To Shipton On Cherwell Shipton On Cherwell Kidlington OX5 1JL | Consult Date | Reply Due | Reply Received22/09/2016 | Re-Consult Date | Reply Due | Reply Date22/09/2016 |
Address5 Canal Road Thrupp Kidlington OX5 1LD | Consult Date | Reply Due | Reply Received27/09/2016 | Re-Consult Date | Reply Due | Reply Date27/09/2016 |
Address260 Banbury Road Thrupp Oxford OX5 1JU | Consult Date | Reply Due | Reply Received26/09/2016 | Re-Consult Date | Reply Due | Reply Date26/09/2016 |
AddressAnnies Traditional Tea Marquee Canal Yard Canal Road Thrupp Kidlington OX5 1JZ | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThrupp Canal Cruise Club Canal Yard Canal Road Thrupp Banbury OX5 1JZ | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThe Annexe The Coach House Canal Road Thrupp Kidlington OX5 1JY | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThe Coach House Canal Road Thrupp Kidlington OX5 1JY | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressNarrowboat Doris Canal Yard Canal Road Thrupp Kidlington OX5 1JZ | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThe Manor Farm House Canal Road Thrupp Kidlington OX5 1JY | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressThe Dovecote 10 Canal Road Thrupp Kidlington OX5 1LD | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressBritish Waterways Board Canal Yard Canal Road Thrupp Kidlington OX5 1JZ | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
AddressAnnies Tea Room Canal Yard Canal Road Thrupp Kidlington OX5 1JZ | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
Consultee List
Name | Address | Consult Date | Reply Due | Reply Received | Type |
---|---|---|---|---|---|
NameArchaeology (OCC) | Address | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received27/09/2016 | TypeStandard Consultee |
NameCanal And River Trust | AddressStrategy, Planning & Design Fradley Junction Alrewas Burton-on-Trent Staffordshire DE13 7DN | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received21/09/2016 | TypeStandard Consultee |
NameConservation (CDC) | Address | Consult Date12/09/2016 | Reply Due26/09/2016 | Reply Received | TypeStandard Consultee |
NameContaminated Land (CDC) | Address | Consult Date12/09/2016 | Reply Due26/09/2016 | Reply Received14/09/2016 | TypeStandard Consultee |
NameEcology (CDC) | Address | Consult Date12/09/2016 | Reply Due26/09/2016 | Reply Received | TypeStandard Consultee |
NameEmergency Planning (CDC) | AddressEnvironmental Health Officer Community Services Cherwell District Council | Consult Date12/09/2016 | Reply Due26/09/2016 | Reply Received | TypeStandard Consultee |
NameEnvironment Agency | AddressRed Kite House Howbery Park Crowmarsh Gifford WALLINGFORD OX10 8BD | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received06/10/2016 | TypeStandard Consultee |
NameLocal Highways Authority OCC | Address | Consult Date12/09/2016 | Reply Due26/09/2016 | Reply Received13/10/2016 | TypeStandard Consultee |
NameRights Of Way (OCC) | Address | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received | TypeStandard Consultee |
NameShipton On Cherwell And Thrupp Parish Council | Address12 The Slade Silverstone NN12 8UH | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received22/09/2016 | TypeStandard Consultee |
NameThames Water | AddressDevelopment Planning Asset Investment Unit Maple Lodge Denham Way RICKMANSWORTH WD3 9SQ | Consult Date12/09/2016 | Reply Due03/10/2016 | Reply Received14/09/2016 | TypeStandard Consultee |
NameIan Upstone (Waste And Recycling Manager) - Waste & Recycling (CDC) | Address | Consult Date12/09/2016 | Reply Due26/09/2016 | Reply Received | TypeStandard Consultee |
Description | Display Date | Expiry Date | Notice Type |
---|---|---|---|
DescriptionSite Notice General | Display Date | Expiry Date | Notice Type |
DescriptionBicester Advertiser | Display Date22/09/2016 | Expiry Date13/10/2016 | Notice Type |
To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.
Document Type | Date | Description | File Size | Drawing/Rev Number | |
---|---|---|---|---|---|
Application Forms | |||||
Application Document | 19/12/2016 | site visit | (19kb) | - | |
Application Document | 06/09/2016 | App form | (75kb) | - | |
Application Document | 06/09/2016 | Info Map | (314kb) | - | |
Application Document | 06/09/2016 | Neighbour List | (33kb) | - | |
Application Document | 06/09/2016 | Neighbour Map | (120kb) | - | |
Application Document | 06/09/2016 | Checklist | (142kb) | - | |
Application Document | 12/09/2016 | Publicity | (123kb) | - | |
Supporting Documents | |||||
Flood Risk Assessment | 06/09/2016 | Flood risk assessment P4 | (4974kb) | - | |
Flood Risk Assessment | 06/09/2016 | Flood risk assessment P3 | (3006kb) | - | |
Flood Risk Assessment | 06/09/2016 | Flood risk assessment P2 | (4519kb) | - | |
Flood Risk Assessment | 06/09/2016 | Flood risk assessment P1 | (4709kb) | - | |
Reports – Miscellaneous | 06/09/2016 | Biomass Boiler specification | (954kb) | - | |
Supporting Documents | 06/09/2016 | Planning statement | (463kb) | - | |
Supporting Documents | 06/09/2016 | Statement of significance | (1642kb) | - | |
Supporting Documents | 06/09/2016 | Ecological assessment | (609kb) | - | |
Supporting Documents | 06/09/2016 | Design & Access statement | (1271kb) | - | |
Site Plans | |||||
Plans – Block Plan/Site Layout | 06/09/2016 | Site layout | (3365kb) | - | |
Site Location Plan | 06/09/2016 | Location plan | (109kb) | - | |
Existing Plans | |||||
Plans – Sections/Surveys | 06/09/2016 | Survey Information | (328kb) | - | |
Proposed Plans | |||||
Plans – Floor Plans/Elevations | 06/09/2016 | Proposed NE elevation | (2847kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Proposed SE elevation | (2991kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Proposed NW elevation | (2737kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Proposed SW courtyard elevation | (3322kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Proposed NW Courtyard elevation | (2731kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Proposed SE courtyard elevation | (2583kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | First floor layout unit 2 & 3 | (1310kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | First floor layout unit 1 | (1031kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Ground floor layout units 2 & 3 | (1329kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Ground floor layout unit 1 | (1110kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Existing elevations 2 | (108kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Existing elevations 1 | (111kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Existing first floor plan | (107kb) | - | |
Plans – Floor Plans/Elevations | 06/09/2016 | Existing ground floor plan | (109kb) | - | |
Plans – Miscellaneous | 06/09/2016 | Existing building to accomodate biomass boiler | (136kb) | - | |
Plans – Miscellaneous | 06/09/2016 | Existing building to accomodate biomass boiler | (122kb) | - | |
Consultee Responses | |||||
Consultation Response | 13/10/2016 | OCC Highways 13/10/16 | (29kb) | - | |
Consultation Response | 27/09/2016 | OCC Archaeology - 27.09.16 | (24kb) | - | |
Consultation Response | 21/09/2016 | Canal and River Trust 21.09.2016 | (123kb) | - | |
Consultation Response | 22/09/2016 | Shipton on Cherwell and Thrupp Parish Council 22.09.2016 | (15kb) | - | |
Consultation Response | 15/09/2016 | Waste and Recycling - 15.09.16 | (32kb) | - | |
Consultation Response | 14/09/2016 | Thames Water - 14.09.16 | (26kb) | - | |
Consultation Response | 06/10/2016 | Environment Agency - 06.10.16 | (174kb) | - | |
Consultation Response | 06/10/2016 | Environment Agency - 06.10.16 | (32kb) | - | |
Consultation Response | 14/09/2016 | Contaminated Land - 14.09.16 | (22kb) | - | |
Public Comments | |||||
Public Comments | 16/11/2016 | Brading, Karen - 12.11.16 | (32kb) | - | |
Public Comments | 27/09/2016 | Brading, K - 27.09.16 | (36kb) | - | |
Public Comments | 27/09/2016 | Durrant, L - 26.09.16 | (32kb) | - | |
Officer/Committee Consideration | |||||
Officer Report | 09/12/2016 | Refusal Case Officers report - 9.12.16 | (99kb) | - | |
Decision and Legal Agreements | |||||
Decision | 09/12/2016 | Refusal - 9.12.16 | (118kb) | - |
Application Forms | |||||
---|---|---|---|---|---|
Application Document (19kb) - site visit | |||||
Application Document (75kb) - App form | |||||
Application Document (314kb) - Info Map | |||||
Application Document (33kb) - Neighbour List | |||||
Application Document (120kb) - Neighbour Map | |||||
Application Document (142kb) - Checklist | |||||
Application Document (123kb) - Publicity | |||||
Supporting Documents | |||||
Flood Risk Assessment (4974kb) - Flood risk assessment P4 | |||||
Flood Risk Assessment (3006kb) - Flood risk assessment P3 | |||||
Flood Risk Assessment (4519kb) - Flood risk assessment P2 | |||||
Flood Risk Assessment (4709kb) - Flood risk assessment P1 | |||||
Reports – Miscellaneous (954kb) - Biomass Boiler specification | |||||
Supporting Documents (463kb) - Planning statement | |||||
Supporting Documents (1642kb) - Statement of significance | |||||
Supporting Documents (609kb) - Ecological assessment | |||||
Supporting Documents (1271kb) - Design & Access statement | |||||
Site Plans | |||||
Plans – Block Plan/Site Layout (3365kb) - Site layout | |||||
Site Location Plan (109kb) - Location plan | |||||
Existing Plans | |||||
Plans – Sections/Surveys (328kb) - Survey Information | |||||
Proposed Plans | |||||
Plans – Floor Plans/Elevations (2847kb) - Proposed NE elevation | |||||
Plans – Floor Plans/Elevations (2991kb) - Proposed SE elevation | |||||
Plans – Floor Plans/Elevations (2737kb) - Proposed NW elevation | |||||
Plans – Floor Plans/Elevations (3322kb) - Proposed SW courtyard elevation | |||||
Plans – Floor Plans/Elevations (2731kb) - Proposed NW Courtyard elevation | |||||
Plans – Floor Plans/Elevations (2583kb) - Proposed SE courtyard elevation | |||||
Plans – Floor Plans/Elevations (1310kb) - First floor layout unit 2 & 3 | |||||
Plans – Floor Plans/Elevations (1031kb) - First floor layout unit 1 | |||||
Plans – Floor Plans/Elevations (1329kb) - Ground floor layout units 2 & 3 | |||||
Plans – Floor Plans/Elevations (1110kb) - Ground floor layout unit 1 | |||||
Plans – Floor Plans/Elevations (108kb) - Existing elevations 2 | |||||
Plans – Floor Plans/Elevations (111kb) - Existing elevations 1 | |||||
Plans – Floor Plans/Elevations (107kb) - Existing first floor plan | |||||
Plans – Floor Plans/Elevations (109kb) - Existing ground floor plan | |||||
Plans – Miscellaneous (136kb) - Existing building to accomodate biomass boiler | |||||
Plans – Miscellaneous (122kb) - Existing building to accomodate biomass boiler | |||||
Consultee Responses | |||||
Consultation Response (29kb) - OCC Highways 13/10/16 | |||||
Consultation Response (24kb) - OCC Archaeology - 27.09.16 | |||||
Consultation Response (123kb) - Canal and River Trust 21.09.2016 | |||||
Consultation Response (15kb) - Shipton on Cherwell and Thrupp Parish Council 22.09.2016 | |||||
Consultation Response (32kb) - Waste and Recycling - 15.09.16 | |||||
Consultation Response (26kb) - Thames Water - 14.09.16 | |||||
Consultation Response (174kb) - Environment Agency - 06.10.16 | |||||
Consultation Response (32kb) - Environment Agency - 06.10.16 | |||||
Consultation Response (22kb) - Contaminated Land - 14.09.16 | |||||
Public Comments | |||||
Public Comments (32kb) - Brading, Karen - 12.11.16 | |||||
Public Comments (36kb) - Brading, K - 27.09.16 | |||||
Public Comments (32kb) - Durrant, L - 26.09.16 | |||||
Officer/Committee Consideration | |||||
Officer Report (99kb) - Refusal Case Officers report - 9.12.16 | |||||
Decision and Legal Agreements | |||||
Decision (118kb) - Refusal - 9.12.16 |
Addresses |
---|
Adjacent The Coach House Canal Road Thrupp |
4Th D Landscape Services 4Th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ |
Planning Applications | ||||||
Application number | Valid Date | Application Type | Location | Proposal | Decision | Decision Issued Date |
---|---|---|---|---|---|---|
16/01747/F | 26/08/2016 | Full Development | 4th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ | Demolition of an existing agricultural barn and alterations to and conversion of two existing storage buildings into three residential dwellings (Resubmission of 15/02075/F). | Refused | 09/12/2016 |
15/02075/F | 13/11/2015 | Full Development | 4th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ | Alterations and extensions to two existing storage buildings (Class B8 Use) and conversion to form three residential dwellings (C3 Use Class) and associated works (including the demolition of an existing agricultural barn) | Refused | 08/01/2016 |
17/00524/F | 29/03/2017 | Full Development | 4th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ | Conversion of two existing storage buildings into three residential dwellings (C3 Use Class) and associated works (including the demolition of an existing agricultural barn) | Permitted | 14/07/2017 |
19/00077/DISC | 06/03/2019 | Discharge Of Conditions | 4th D Landscape Services Canal Road Thrupp Kidlington OX5 1JZ | Discharge of Conditions 4 (surface water drainage), 5 (desk study and site walk over), 6 (intrusive investigation), 7 (remediation scheme), 10 (biodiversity method statement), 12 (timber cladding samples) 13 (stone sample panel), 14 (design details), 15 (protective fencing), 17 (landscaping scheme), 19 (car parking plan) and 22 (amended details of front courtyard) of 17/00524/F | Permitted | 11/07/2019 |
Building Control Applications | ||||||
Application number | Received Date | Validated Date | Application Type | Location | Proposal | |
---|---|---|---|---|---|---|
18/01109/OTHFPD | 01/10/2018 | 05/10/2018 | Full Plans (Domestic/Estimated Cost) | Canal Road Thrupp Kidlington OX5 1JZ | Conversion of two existing storage buildings into three residential dwellings and associated works |