Track this application
Application Number 14/01466/F |
Application Type Full Development |
Status Application Permitted |
Decision Level Delegated |
Location Eco Town Marketing Suite
Banbury Road
Bicester
Oxfordshire |
|
Proposal The erection of a temporary marketing suite and associated temporary car-park and access, together with associated temporary landscaping and features |
|
Parish Caversfield |
Ward Caversfield |
Received Date 28/08/2014 |
Valid Date 19/09/2014 |
Weekly List Date |
Comments Due Date |
Target Decision Date 14/11/2014 |
Committee Date |
Decision Permitted |
Decision Issued Date 11/03/2015 |
Appeal Received Date |
Appeal Start Date |
Appeal Decision |
Appeal Decision Date |
Applicant A2 Dominion Development Ltd |
Applicant's Address Mr Time Giddy
Godstow Court
5 West Way
Botley
Oxford
OX2 0GE |
Agent
Barton Willmore LLP
|
Agents's Address
Ms Alex Wilson
7 Soho Square
London
W1D 3QB
|
Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.
Neighbour List
No associated neighbours |
Consultee List
Name | Address | Consult Date | Reply Due | Reply Received | Type |
---|---|---|---|---|---|
NameAppropriate Parish Council | Address | Consult Date25/09/2014 | Reply Due16/10/2014 | Reply Received14/10/2014 | TypeStandard Consultee |
NameEcology (CDC) | Address | Consult Date25/09/2014 | Reply Due09/10/2014 | Reply Received08/10/2014 | TypeStandard Consultee |
NameLocal Highways Authority OCC | Address | Consult Date25/09/2014 | Reply Due16/10/2014 | Reply Received15/10/2014 | TypeStandard Consultee |
Description | Display Date | Expiry Date | Notice Type |
---|---|---|---|
DescriptionGENERAL APPLN | Display Date | Expiry Date | Notice Type |
Description | Display Date02/10/2014 | Expiry Date | Notice Type |
To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.
Document Type | Date | Description | File Size | Drawing/Rev Number | |
---|---|---|---|---|---|
Application Forms | |||||
Application Document | 24/09/2014 | Info map | (339kb) | - | |
Application Document | 24/09/2014 | Neighbour map | (637kb) | - | |
Application Document | 24/09/2014 | Property history | (226kb) | - | |
Application Document | 24/09/2014 | Checklist, constraints, publicity | (309kb) | - | |
Application Document | 24/09/2014 | App form | (261kb) | - | |
Application Document | 09/06/2015 | Con 3 - App Form | (110kb) | - | |
Application Document | 29/04/2015 | site visit | (21kb) | - | |
Application Document | 25/09/2014 | Site notice | (121kb) | - | |
Supporting Documents | |||||
Reports – Miscellaneous | 29/04/2015 | AMD 19/2/15 - Lighting proposals | (1049kb) | - | |
Reports – Miscellaneous | 30/10/2014 | Marketing suite | (2072kb) | - | |
Supporting Documents | 24/09/2014 | Planning statement | (2115kb) | - | |
Site Plans | |||||
Site Location Plan | 24/09/2014 | Site location | (239kb) | - | |
Existing Plans | |||||
Plans – Sections/Surveys | 29/04/2015 | AMD 19/2/15 - proposed section B-B | (318kb) | - | |
Plans – Sections/Surveys | 29/04/2015 | AMD 19/2/15 - proposed section A-A | (360kb) | - | |
Proposed Plans | |||||
Plans – Floor Plans/Elevations | 29/04/2015 | AMD 19/2/15 - proposed elevation east | (531kb) | - | |
Plans – Floor Plans/Elevations | 29/04/2015 | AMD 19/2/15 - proposed elevation north | (436kb) | - | |
Plans – Floor Plans/Elevations | 29/04/2015 | AMD 19/2/15 - proposed elevation south | (493kb) | - | |
Plans – Floor Plans/Elevations | 29/04/2015 | AMD 19/2/15 - proposed elevation west | (463kb) | - | |
Plans – Floor Plans/Elevations | 29/04/2015 | AMD 19/2/15 - proposed roof plan | (329kb) | - | |
Plans – Floor Plans/Elevations | 29/04/2015 | AMD 19/2/15 - proposed first floor | (334kb) | - | |
Plans – Floor Plans/Elevations | 29/04/2015 | AMD 19/2/15 - proposed ground floor | (477kb) | - | |
Plans – Details | 24/09/2014 | 12-1196-03 4 of 4 Rev P2 Drainage arrangement | (23144kb) | - | |
Plans – Details | 24/09/2014 | 7256 Foul & surface water drainage | (1556kb) | - | |
Plans – Details | 24/09/2014 | 7211 SE Access proposed drainage | (1217kb) | - | |
Plans – Details | 09/06/2015 | Con 3 - Light bulb details | (215kb) | - | |
Plans – Details | 09/06/2015 | Con 3 - Lighting details - post | (302kb) | - | |
Plans – Details | 09/06/2015 | Con 3 - Lighting details | (183kb) | - | |
Plans – Details | 09/06/2015 | Con 3 - Light fitting details | (111kb) | - | |
Plans – Details | 29/04/2015 | AMD 19/2/15 - LL301 show home/marketing suite lighting plan | (526kb) | - | |
Plans – Details | 29/04/2015 | AMD 19/2/15 - 1000C co-ordination plan sheet 1 | (3531kb) | - | |
Plans – Details | 09/06/2015 | Con 3 - Show home/Marketing Suite - Lighting Plan | (1685kb) | - | |
Plans – Details | 26/10/2015 | Con 3 - car park area bollards | (344kb) | - | |
Plans – Landscape | 29/04/2015 | AMD 19/2/15 - Soft landscape strategy | (6184kb) | - | |
Plans – Landscape | 29/04/2015 | AMD 19/2/15 - PL409 show home/marketing suite planting numbers summary | (546kb) | - | |
Plans – Landscape | 29/04/2015 | AMD 19/2/15 - PL402 planting plan marketing suite detail | (1503kb) | - | |
Plans – Landscape | 29/04/2015 | AMD 19/2/15 - MP005 landscape masterplan marketing suite detail | (688kb) | - | |
Plans – Landscape | 29/04/2015 | AMD 19/2/15 - MP001 landscape masterplan | (1091kb) | - | |
Plans – Landscape | 29/04/2015 | AMD 19/2/15 - PL408 planting plan car park/communal area | (3098kb) | - | |
Plans – Miscellaneous | 24/09/2014 | 12-1196-75 Rev P02 Site hoarding plan | (1305kb) | - | |
Consultee Responses | |||||
Consultation Response | 17/10/2014 | Bicester Town Council 14/10/14 | (11kb) | - | |
Consultation Response | 15/10/2014 | OCC Highways - 15-10-14 | (110kb) | - | |
Consultation Response | 08/10/2014 | Ecology Officer - 08-10-14 | (22kb) | - | |
Consultation Response | 29/04/2015 | Landscape architect 16/1/15 | (158kb) | - | |
Officer/Committee Consideration | |||||
Officer Report | 29/04/2015 | (254kb) | - | ||
Decision and Legal Agreements | |||||
Decision | 22/09/2015 | Con 3 - 22.09.15 | (46kb) | - | |
Planning Application Documents | |||||
Superseded | 24/09/2014 | SUPP - 0004 P04 North, south, west elevations | (482kb) | - | |
Superseded | 24/09/2014 | SUPP - 0003 P04 East elevation | (190kb) | - | |
Superseded | 24/09/2014 | SUPP - 0002 P03 Roof plan & sections | (352kb) | - | |
Superseded | 24/09/2014 | SUPP - 0001 P04 Proposed floor plans | (180kb) | - | |
Superseded | 24/09/2014 | SUPP - BET_SM_L/S Landscaping masterplan | (1068kb) | - |
Application Forms | |||||
---|---|---|---|---|---|
Application Document (339kb) - Info map | |||||
Application Document (637kb) - Neighbour map | |||||
Application Document (226kb) - Property history | |||||
Application Document (309kb) - Checklist, constraints, publicity | |||||
Application Document (261kb) - App form | |||||
Application Document (110kb) - Con 3 - App Form | |||||
Application Document (21kb) - site visit | |||||
Application Document (121kb) - Site notice | |||||
Supporting Documents | |||||
Reports – Miscellaneous (1049kb) - AMD 19/2/15 - Lighting proposals | |||||
Reports – Miscellaneous (2072kb) - Marketing suite | |||||
Supporting Documents (2115kb) - Planning statement | |||||
Site Plans | |||||
Site Location Plan (239kb) - Site location | |||||
Existing Plans | |||||
Plans – Sections/Surveys (318kb) - AMD 19/2/15 - proposed section B-B | |||||
Plans – Sections/Surveys (360kb) - AMD 19/2/15 - proposed section A-A | |||||
Proposed Plans | |||||
Plans – Floor Plans/Elevations (531kb) - AMD 19/2/15 - proposed elevation east | |||||
Plans – Floor Plans/Elevations (436kb) - AMD 19/2/15 - proposed elevation north | |||||
Plans – Floor Plans/Elevations (493kb) - AMD 19/2/15 - proposed elevation south | |||||
Plans – Floor Plans/Elevations (463kb) - AMD 19/2/15 - proposed elevation west | |||||
Plans – Floor Plans/Elevations (329kb) - AMD 19/2/15 - proposed roof plan | |||||
Plans – Floor Plans/Elevations (334kb) - AMD 19/2/15 - proposed first floor | |||||
Plans – Floor Plans/Elevations (477kb) - AMD 19/2/15 - proposed ground floor | |||||
Plans – Details (23144kb) - 12-1196-03 4 of 4 Rev P2 Drainage arrangement | |||||
Plans – Details (1556kb) - 7256 Foul & surface water drainage | |||||
Plans – Details (1217kb) - 7211 SE Access proposed drainage | |||||
Plans – Details (215kb) - Con 3 - Light bulb details | |||||
Plans – Details (302kb) - Con 3 - Lighting details - post | |||||
Plans – Details (183kb) - Con 3 - Lighting details | |||||
Plans – Details (111kb) - Con 3 - Light fitting details | |||||
Plans – Details (526kb) - AMD 19/2/15 - LL301 show home/marketing suite lighting plan | |||||
Plans – Details (3531kb) - AMD 19/2/15 - 1000C co-ordination plan sheet 1 | |||||
Plans – Details (1685kb) - Con 3 - Show home/Marketing Suite - Lighting Plan | |||||
Plans – Details (344kb) - Con 3 - car park area bollards | |||||
Plans – Landscape (6184kb) - AMD 19/2/15 - Soft landscape strategy | |||||
Plans – Landscape (546kb) - AMD 19/2/15 - PL409 show home/marketing suite planting numbers summary | |||||
Plans – Landscape (1503kb) - AMD 19/2/15 - PL402 planting plan marketing suite detail | |||||
Plans – Landscape (688kb) - AMD 19/2/15 - MP005 landscape masterplan marketing suite detail | |||||
Plans – Landscape (1091kb) - AMD 19/2/15 - MP001 landscape masterplan | |||||
Plans – Landscape (3098kb) - AMD 19/2/15 - PL408 planting plan car park/communal area | |||||
Plans – Miscellaneous (1305kb) - 12-1196-75 Rev P02 Site hoarding plan | |||||
Consultee Responses | |||||
Consultation Response (11kb) - Bicester Town Council 14/10/14 | |||||
Consultation Response (110kb) - OCC Highways - 15-10-14 | |||||
Consultation Response (22kb) - Ecology Officer - 08-10-14 | |||||
Consultation Response (158kb) - Landscape architect 16/1/15 | |||||
Officer/Committee Consideration | |||||
Officer Report (254kb) - | |||||
Decision and Legal Agreements | |||||
Decision (46kb) - Con 3 - 22.09.15 | |||||
Planning Application Documents | |||||
Superseded (482kb) - SUPP - 0004 P04 North, south, west elevations | |||||
Superseded (190kb) - SUPP - 0003 P04 East elevation | |||||
Superseded (352kb) - SUPP - 0002 P03 Roof plan & sections | |||||
Superseded (180kb) - SUPP - 0001 P04 Proposed floor plans | |||||
Superseded (1068kb) - SUPP - BET_SM_L/S Landscaping masterplan |
Addresses |
---|
10 Charlotte Avenue Bicester OX27 8AN |
2 Charlotte Avenue Bicester OX27 8AN |
4 Charlotte Avenue Bicester OX27 8AN |
Elmsbrook Sales And Marketing Suite Charlotte Avenue Bicester OX27 8AN |
Bicester Eco Town Exemplar Site Banbury Road Bicester |
Planning Applications | ||||||
Application number | Valid Date | Application Type | Location | Proposal | Decision | Decision Issued Date |
---|---|---|---|---|---|---|
10/01780/HYBRID | 23/12/2010 | Hybrid/Mixed Application | Bicester Eco Town Exemplar Site Caversfield Oxfordshire | Development of Exemplar phase of NW Bicester Eco Town to secure full planning permission for 393 residential units and an energy centre (up to 400 square metres), means of access, car parking, landscape, amenity space and service infrastructure and outline permission for a nursery of up to 350 square metres (use class D2), a community centre of up to 350 square metres (sui generis), 3 retail units of up to 770 square metres (including but not exclusively a convenience store, a post office and a pharmacy (use class A1)), an Eco-Business Centre of up to 1,800 square metres (use class B1), office accommodation of up to 1,100 square metres (use class B1), an Eco-Pub of up to 190 square metres (use class A4), and a primary school site measuring up to 1.34 hectares with access and layout to be determined. | Permitted | 10/07/2012 |
15/00621/ADV | 18/05/2015 | Advertisement | Bicester Eco Town Exemplar Site Banbury Road Bicester Oxfordshire | Erection of four fascia signs at the marketing suite and erection of hoarding and flags at the South East entrance. | Permitted | 04/11/2015 |
15/00229/DISC | 10/06/2015 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester Oxfordshire | Clearance of condition 38 of 10/01780/HYBRID | Permitted | 12/02/2016 |
15/00258/DISC | 06/07/2015 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester Oxfordshire | Partial discharge 14, 15 & 19 of 10/01780/HYBRID - (Phase 1) | Permitted | 11/04/2016 |
15/00114/DISC | 19/03/2015 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road B4100 Caversfield | Partial discharge of conditions 5 & 60 of 10/01780/HYBRID | Permitted | 22/10/2015 |
15/00212/DISC | 01/06/2015 | Discharge Of Conditions | Eco Town Marketing Suite Banbury Road Bicester Oxfordshire | Discharge of Condition 3 of 14/01466/F | Permitted | 22/09/2015 |
14/01466/F | 19/09/2014 | Full Development | Eco Town Marketing Suite Banbury Road Bicester Oxfordshire | The erection of a temporary marketing suite and associated temporary car-park and access, together with associated temporary landscaping and features | Permitted | 11/03/2015 |
15/00110/DISC | 18/03/2015 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road B4100 Caversfield | Clearance of condition 18 of 10/01780/HYBRID | Permitted | 13/07/2015 |
15/00111/DISC | 18/03/2015 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road B4100 Caversfield | Partial discharge of conditions 9 & 90 of 10/01780/HYBRID | Permitted | 13/08/2015 |
18/00473/DISC | 30/11/2018 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge of condition 53 (existing and proposed site levels) of 10/01780/HYBRID | Permitted | 24/01/2019 |
17/00135/NMA | 11/12/2017 | Non Material Amendments | Bicester Eco Town Exemplar Site Banbury Road Bicester | Non-Material Amendment to 10/01780/HYBRID - Amendments to the wording of Condition 11 | Permitted | 08/01/2018 |
17/00223/DISC | 08/05/2017 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge condition 31 (landscape design scheme) of 10/01780/HYBRID | Permitted | 02/10/2017 |
18/00039/DISC | 07/02/2018 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge of condition 19 (materials and finishes), 23 (bus stops), 59 (Construction Management Travel Plan) of 10/01780/HYBRID | Permitted | 25/04/2019 |
17/00600/DISC | 08/01/2018 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge of conditions 8 (day lighting), 10 (overheating), 14 (boundary enclosures), 15 (fenestration, roof verge and eaves, cills, lintols and infill panels details), 16 (details of revised plans), 17 (parking scheme), 18 (streetscape details), 20 (construction and planting of green roofs and maintenance programme), 24 (access routes details), 25 (final surface treatment), 30 (rainwater harvesting), 31 (landscape design scheme), 33 (open space/play space), 63 (discharge of water onto highway), 65 (drainage strategy), 67 (scheme to avoid risk of ground water flooding), 69 (surface water drainage scheme) and 80 (tree pits and associated ground level surfacing materials) of 10/01780/HYBRID | Permitted | 10/05/2019 |
17/00381/DISC | 07/08/2017 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge condition 19 (external materials) of 10/01780/HYBRID | Permitted | 21/09/2017 |
19/00035/NMA | 26/04/2019 | Non Material Amendments | Bicester Eco Town Exemplar Site Caversfield Oxfordshire | Non-Material Amendment to 10/01780/HYBRID - Amend the wording of Planning Conditions 13, 14, 18, 24, 25, 31, 33, 53, 68, 69, 80 and 84 to allow for the submission of information pursuant to these conditions where design has been revised. | Application Withdrawn | 07/06/2019 |
19/00161/DISC | 30/04/2019 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge condition 90 (fire hydrants) of 10/01780/HYBRID | Permitted | 27/06/2019 |
19/00155/DISC | 26/04/2019 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Partial Discharge of Conditions 31; 53 and 69 (infrastructure phase (specifically the river corridor)), 14 and 18 (residential phase two), 24 and 25 (infrastructure phase (specifically spine road running through residential phase 2)) of 10/01780/HYBRID | Permitted | 04/05/2020 |
19/00214/DISC | 07/06/2019 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Partial discharge of conditions 13 (positioning of bicycle and bin stores), 24 (design and construction details), 31 (landscape design), 53 (site levels) and 84 (ecological construction method statement) (Infrastructure Phase) of 10/01780/HYBRID | Permitted | 01/05/2020 |