Back to results
New search
Reference Number 23/30458/CP
|
Application Type Competent Persons Scheme
|
Status Competent Persons Notification
|
Parish |
Building Surveyor |
Email |
Phone |
Site Address 2 Wintergreen Fields
Bicester
OX27 8BG
|
||
Description of Works
Install one or more new circuits.
|
||
Received Date 29/05/2023
|
Valid Date 21/05/2023
|
|
5 Week Date
25/06/2023
|
8 Week Date
16/07/2023
|
|
Decision |
Decision Date
21/05/2023
|
|
Commencement Date
21/05/2023
|
Completion Date
21/05/2023
|
Applicant |
|
Applicant's Address |
|
Agent
P Caine Electrical Services Ltd
|
|
Agent's Address |
|
Approved Inspector's Insurer |
Competent Persons Scheme Name
NAPIT
|
Plot Address | Plot Status | Commencement Date | Completion Date |
---|
Planning Applications | ||||||
Application number | Valid Date | Application Type | Location | Proposal | Decision | Decision Issued Date |
---|---|---|---|---|---|---|
10/01780/HYBRID | 23/12/2010 | Hybrid/Mixed Application | Bicester Eco Town Exemplar Site Caversfield Oxfordshire | Development of Exemplar phase of NW Bicester Eco Town to secure full planning permission for 393 residential units and an energy centre (up to 400 square metres), means of access, car parking, landscape, amenity space and service infrastructure and outline permission for a nursery of up to 350 square metres (use class D2), a community centre of up to 350 square metres (sui generis), 3 retail units of up to 770 square metres (including but not exclusively a convenience store, a post office and a pharmacy (use class A1)), an Eco-Business Centre of up to 1,800 square metres (use class B1), office accommodation of up to 1,100 square metres (use class B1), an Eco-Pub of up to 190 square metres (use class A4), and a primary school site measuring up to 1.34 hectares with access and layout to be determined. | Permitted | 10/07/2012 |
14/01970/OCC | 25/11/2014 | Deemed Regs 3 - County Council | Proposed School Site At Bicester Eco Town Banbury Road B4100 Caversfield | 2FE Primary School with a phased construction to allow a 1FE school with 2FE core facilities to be constructed during the first phase and to allow for future expansion to a 2FE school as phase 2; to be constructed as and when demand requires - (R3.0139/14) | No Objections | 22/12/2014 |
18/00473/DISC | 30/11/2018 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge of condition 53 (existing and proposed site levels) of 10/01780/HYBRID | Permitted | 24/01/2019 |
17/00135/NMA | 11/12/2017 | Non Material Amendments | Bicester Eco Town Exemplar Site Banbury Road Bicester | Non-Material Amendment to 10/01780/HYBRID - Amendments to the wording of Condition 11 | Permitted | 08/01/2018 |
17/00223/DISC | 08/05/2017 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge condition 31 (landscape design scheme) of 10/01780/HYBRID | Permitted | 02/10/2017 |
18/00039/DISC | 07/02/2018 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge of condition 19 (materials and finishes), 23 (bus stops), 59 (Construction Management Travel Plan) of 10/01780/HYBRID | Permitted | 25/04/2019 |
17/00600/DISC | 08/01/2018 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge of conditions 8 (day lighting), 10 (overheating), 14 (boundary enclosures), 15 (fenestration, roof verge and eaves, cills, lintols and infill panels details), 16 (details of revised plans), 17 (parking scheme), 18 (streetscape details), 20 (construction and planting of green roofs and maintenance programme), 24 (access routes details), 25 (final surface treatment), 30 (rainwater harvesting), 31 (landscape design scheme), 33 (open space/play space), 63 (discharge of water onto highway), 65 (drainage strategy), 67 (scheme to avoid risk of ground water flooding), 69 (surface water drainage scheme) and 80 (tree pits and associated ground level surfacing materials) of 10/01780/HYBRID | Permitted | 10/05/2019 |
17/00381/DISC | 07/08/2017 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge condition 19 (external materials) of 10/01780/HYBRID | Permitted | 21/09/2017 |
19/00035/NMA | 26/04/2019 | Non Material Amendments | Bicester Eco Town Exemplar Site Caversfield Oxfordshire | Non-Material Amendment to 10/01780/HYBRID - Amend the wording of Planning Conditions 13, 14, 18, 24, 25, 31, 33, 53, 68, 69, 80 and 84 to allow for the submission of information pursuant to these conditions where design has been revised. | Application Withdrawn | 07/06/2019 |
19/00161/DISC | 30/04/2019 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Discharge condition 90 (fire hydrants) of 10/01780/HYBRID | Permitted | 27/06/2019 |
19/00155/DISC | 26/04/2019 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Partial Discharge of Conditions 31; 53 and 69 (infrastructure phase (specifically the river corridor)), 14 and 18 (residential phase two), 24 and 25 (infrastructure phase (specifically spine road running through residential phase 2)) of 10/01780/HYBRID | Permitted | 04/05/2020 |
19/00214/DISC | 07/06/2019 | Discharge Of Conditions | Bicester Eco Town Exemplar Site Banbury Road Bicester | Partial discharge of conditions 13 (positioning of bicycle and bin stores), 24 (design and construction details), 31 (landscape design), 53 (site levels) and 84 (ecological construction method statement) (Infrastructure Phase) of 10/01780/HYBRID | Permitted | 01/05/2020 |
19/02854/F | 12/02/2020 | Full Development | 2 Wintergreen Fields Bicester Oxfordshire OX27 8BG | Single storey rear extension, increased height of side wall | Permitted | 08/04/2020 |
Building Control Applications | ||||||
Application number | Received Date | Validated Date | Application Type | Location | Proposal | |
---|---|---|---|---|---|---|
CP/NICEIC/00366/2018 | 05/02/2018 | 05/02/2018 | Competent Persons Scheme Type | 2 Wintergreen Fields Bicester OX27 8BG | New full electrical installation (new build) | |
21/12411/CP | 08/10/2021 | 05/10/2021 | Competent Persons Scheme | 2 Wintergreen Fields Bicester OX27 8BG | Install one or more new circuits. | |
23/30458/CP | 29/05/2023 | 21/05/2023 | Competent Persons Scheme | 2 Wintergreen Fields Bicester OX27 8BG | Install one or more new circuits. | |
24/38004/CP | 27/02/2024 | 14/02/2024 | Competent Persons Scheme | 2 Wintergreen Fields Bicester OX27 8BG | Install one or more new circuits. |