Comment on this application
Track this application
| Application Number 25/02919/SCH17 |
Application Type HS2 Schedule 17 submissions |
| Status Under Consultation |
Decision Level Delegated |
| Location Land South Of River Great Ouse And North Of
Evenley Road
Mixbury |
|
| Proposal In accordance with requirements of Paragraph 9(1) of Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval for Work No. 2/105B, 2/106, 2/106A, 2/107 and 2/107A described in Schedule 1 of the HS2 (London - West Midlands) Act 2017 to BE BROUGHT INTO USE. |
|
| Parish |
Ward |
| Received Date 07/11/2025 |
Valid Date 07/11/2025 |
| Weekly List Date |
Comments Due Date |
| Target Decision Date 02/01/2026 |
Committee Date |
| Decision |
Decision Issued Date |
| Appeal Received Date |
Appeal Start Date |
| Appeal Decision |
Appeal Decision Date |
| Applicant HS2 Limited |
| Applicant's Address Mr Tom Podd
Two Snowhill
Birmingham
B4 6GA |
|
Agent
Eiffage Kier JV Ferrovial BAM
|
|
Agents's Address
Mr Mark Roberts
Exchange House
450 Midsummer Boulevard
Milton Keynes
MK9 2EA
|
Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.
Neighbour List
| No associated neighbours |
Consultee List
| Name | Address | Consult Date | Reply Due | Reply Received | Type |
|---|---|---|---|---|---|
| NameTransport Development Control Majors - | AddressOxfordshire County Council | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameConservation (CDC) - | AddressConservation Cherwell District Council 39 Castle Quay Banbury OX16 5FD | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameEcology (CDC) - | AddressCherwell District Council 39 Castle Quay Banbury OX16 5FD | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameEnvironmental Health (CDC) - | AddressEnvironmental Health Cherwell District Council 39 Castle Quay Banbury OX16 5FD | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameLLFA Drainage (OCC) - Lead Local Flood Authority - | AddressDrainage Oxfordshire County Council County Hall, New Road, Oxford, Oxfordshire, OX1 1ND | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameNatural England - | AddressConsultation Services Hornbeam House Electra Way Crewe CW1 6GJ | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameRights Of Way (OCC) - | Address(RoW Field Officer - Northeast) Oxfordshire County Council County Hall New Road. Oxford OX1 1ND | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameEnv Agency HS2 consults - | Address | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameHistoric England - South East Region (Planning) - Historic England - South East Region (Planning) | AddressEastgate Court 195-205 High Street Guildford GU1 3EH | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameLandscape Services (CDC) - Landscapes Officer | AddressLandscapes Officer Cherwell District Council 39 Castle Quay Banbury OX16 5FD | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| NameArchaeology (OCC) - Richard Oram | AddressOxfordshire County Council County Hall, New Road, Oxford, Oxfordshire, OX1 1ND | Consult Date21/11/2025 | Reply Due12/12/2025 | Reply Received | TypeStandard Consultee |
| No Public Notices |
To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.
| Document Type | Date | Description | File Size | Drawing/Rev Number | |
|---|---|---|---|---|---|
| Application Forms | |||||
| Application Documents | 07/11/2025 | Applicationformredacted | (229kb) | - | |
| Application Documents | 07/11/2025 | Cdc P3 R2 Mixbury Bringing Into Use Para 9 (1) Letter 1mc06 Cek Tp Cro Cs06 Cl21 000016 | (111kb) | - | |
| Site Plans | |||||
| Plans - Site | 19/08/2022 | Mixbury Site Location Plan | (1184kb) | 1mc06 Cek Tp Dlo Cs06 Cl21 000002 - | |
| Application Forms | |||||
|---|---|---|---|---|---|
| Application Documents (229kb) - Applicationformredacted | |||||
| Application Documents (111kb) - Cdc P3 R2 Mixbury Bringing Into Use Para 9 (1) Letter 1mc06 Cek Tp Cro Cs06 Cl21 000016 | |||||
| Site Plans | |||||
| Plans - Site (1184kb) 1mc06 Cek Tp Dlo Cs06 Cl21 000002 - Mixbury Site Location Plan |
| Addresses |
|---|
| Land South Of River Great Ouse And North Of Evenley Road Mixbury |
Planning Applications | ||||||
| Application number | Valid Date | Application Type | Location | Proposal | Decision | Decision Issued Date |
|---|---|---|---|---|---|---|
| 22/03834/EL | 21/12/2022 | Electricity Notification | Land South Of River Great Ouse And North Of Evenley Road Mixbury | The existing overhead wood pole electricity line needs to be raised in height to accommodate the High Speed Rail Two (HS2) construction works | No Observations | 14/02/2023 |
| 24/01001/SCH17 | 12/04/2024 | HS2 Schedule 17 submissions | Land South Of River Great Ouse And North Of Evenley Road Mixbury | A plans and specification submission (including part resubmission of details in original planning reference 22/02546/SCH17) in accordance with the requirements of Schedule 17 to the High-Speed Rail (London – West Midlands) Act 2017, the nominated undertaker hereby requests approval of PLANS and SPECIFICATIONS relating to the following development authorised by the Act, - Bridleway 303/4 Overbridge and associated earthworks - Westbury Viaduct Retaining Wall - Location of the permanent fencing and gates - Location of the vehicle restraint barriers | Permitted | 14/06/2024 |
| 25/02919/SCH17 | 07/11/2025 | HS2 Schedule 17 submissions | Land South Of River Great Ouse And North Of Evenley Road Mixbury | In accordance with requirements of Paragraph 9(1) of Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval for Work No. 2/105B, 2/106, 2/106A, 2/107 and 2/107A described in Schedule 1 of the HS2 (London - West Midlands) Act 2017 to BE BROUGHT INTO USE. | ||
| 25/02920/SCH17 | 07/11/2025 | HS2 Schedule 17 submissions | Land South Of River Great Ouse And North Of Evenley Road Mixbury | In accordance with the requirements of Paragraphs 2 and 3 of Schedule 17 to the High-Speed Rail (London – West Midlands) Act 2017, the nominated undertaker hereby requests approval of PLANS AND SPECIFICATIONS relating to the following development authorised by the Act: • Westbury Viaduct (Part of) • Bridleway 303/4 Overbridge and associated earthworks • Westbury Embankment • Mixbury Cutting • Mixbury Embankment • Barton to Mixbury Cutting (Part of) • Featherbed Lane Overbridge and associated earthworks • Earthworks required to Bridleway 303/4 and the approved access tracks and to create 1 no. new access track • Access Track 1 to Drainage Pond 1 • Access Track 2 to Tibbets Farm Auto Transformer Station (ATS) Compound and Drainage Pond 2 • Access Track 3 Warren Farm Access (Part of) • Access Track 4 Field Access off Featherbed Lane (East) The 1 No. new access track is listed below:- • Access Track 5 GSMR Maintenance Access Track • Earthworks associated with the Tibbets Farm Auto Transformer Station (ATS) Compound • Earthworks associated with the GSMR Compound • 1 No. Flood Compensation Area • 2 No. Drainage Ponds • Drainage Ditches • Vehicle Restraint Bund • Watercourse Diversion of the River Great Ouse • Mixbury Culvert and 6 No. Ancillary Culverts (above ground elements only) • 6 No. Line Side Steps (access stairs) • 5 No. minor ditch crossings (slab crossings) • 3 No. drainage concrete cascades • Featherbed Lane Retaining Wall and associated earthworks • Westbury Viaduct Retaining Wall • Noise Barriers • Location of the Vehicle Restraint Barriers • Location of the permanent (security and boundary) fencing | ||