Planning Application - 21/00124/DEM

Skip to tab headings. Skip to tab content.

Application Number
21/00124/DEM
Application Type
Prior Approval - Demolition
Status
Prior Approval Not Required
Decision Level
Delegated
Case Officer
Matthew Chadwick
Location
CPL Petroleum Station Approach Banbury OX16 5AB
Proposal
Demolition works shall be carried out by qualified Contractor and all storage tanks will be emptied from fuel, cleaned, gassed out and cut prior removal to an approved local licensed disposal facility. Bund walls, concrete support bases and the like will be reduced to ground level and removed by approved waste carrier to a licensed site. Foundations and/or supporting structures will be broken out to ground level and removed. For the underground tanks (o.o.u) and pipes the ground shall be inspected to ensure there are no contamination and shall be back filled with clean material. On completion of the demolition works, the site interceptor will be drained and washed out. All site drainage and/or drainage channels will be jet washed and cleaned. The interceptor will be left in full working order. All resultant oily water and sludge etc will be removed from site in a waste water tanker for disposal at a licensed disposal facility.
Parish
Banbury
Ward
Banbury Grimsbury And Hightown
Received Date
13/01/2021
Valid Date
13/01/2021
Weekly List Date
21/01/2021
Comments Due Date
Target Decision Date
10/02/2021
Committee Date
Decision
Prior Approval Not Required
Decision Issued Date
10/02/2021
Appeal Received Date
Appeal Start Date
Appeal Decision
Appeal Decision Date
Applicant
Mr Neil Rimmer
Applicant's Address
Certas Energy UK Limited 302 Bridgewater Place Birchwood park Warrington WA3 6XG
Agent
Mrs Yasameen Fattah Khudhair
Agents's Address
Trident Engineering Consultants Gatehouse Offices Porterfield Road Westway Renfrew PA4 8DJ

Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.


Neighbour List
No associated neighbours

Consultee List
No associated consultees
Public Notices
No Public Notices

To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.

Document Type Date Description File Size Drawing/Rev Number
Application Forms
Application Documents 19/01/2021 App Form (53kb) -
Application Documents 14/01/2021 Photo (236kb) -
Application Documents 14/01/2021 Photo (227kb) -
Supporting Documents
Supporting Documents 20/01/2021 Demolition Site Notice (13kb) -
Officer/Committee Consideration
Officer Report 10/02/2021 Delegated Officer Report - FINAL (14kb) -
Decision and Legal Agreements
Decision 10/02/2021 Decision Notice - FINAL (156kb) -
Application Forms
Application Documents (53kb) - App Form
Application Documents (236kb) - Photo
Application Documents (227kb) - Photo
Supporting Documents
Supporting Documents (13kb) - Demolition Site Notice
Officer/Committee Consideration
Officer Report (14kb) - Delegated Officer Report - FINAL
Decision and Legal Agreements
Decision (156kb) - Decision Notice - FINAL
Addresses
Gb Oils Uk Petroleum Products Ltd Station Approach Banbury OX16 5AB

Planning Applications

Application number Valid Date Application Type Location Proposal Decision Decision Issued Date
21/00124/DEM 13/01/2021 Prior Approval - Demolition CPL Petroleum Station Approach Banbury OX16 5AB Demolition works shall be carried out by qualified Contractor and all storage tanks will be emptied from fuel, cleaned, gassed out and cut prior removal to an approved local licensed disposal facility. Bund walls, concrete support bases and the like will be reduced to ground level and removed by approved waste carrier to a licensed site. Foundations and/or supporting structures will be broken out to ground level and removed. For the underground tanks (o.o.u) and pipes the ground shall be inspected to ensure there are no contamination and shall be back filled with clean material. On completion of the demolition works, the site interceptor will be drained and washed out. All site drainage and/or drainage channels will be jet washed and cleaned. The interceptor will be left in full working order. All resultant oily water and sludge etc will be removed from site in a waste water tanker for disposal at a licensed disposal facility. Prior Approval Not Required 10/02/2021

Back to top.