Track this application
| Application Number 20/00840/LB |
Application Type Listed Building |
| Status Not Proceeded With |
Decision Level Delegated |
| Location Heyford Bridge
Station Road
Lower Heyford |
|
| Proposal Stage 1 - 2020 - repair of previously collapsed sections of northern retaining wall; resurfacing carriageway to provide fall to north side; installation of longitudinal channel drainage on the north side using existing outfalls supplemented with additional outfalls of the same design; prevention of seepage into arches 1 to 4 (the main river arches); Stage 2 - 2021 (provided Stage 1 was successful) - repair and repointing of Arches 1 to 4 including replacement stone ribs and removal of 20th century partial brick cladding to intrados; northern cutwaters to Arches 1 to 4 including removal of cement render and brick repairs to stonework; repointing and repairing stonework on north and south elevations of Arches 1 to 4 and approximately 20% of the remaining elevations |
|
| Parish Steeple Aston |
Ward Fringford And Heyfords |
| Received Date 20/03/2020 |
Valid Date 29/01/2021 |
| Weekly List Date 29/01/2021 |
Comments Due Date |
| Target Decision Date 26/03/2021 |
Committee Date |
| Decision Not proceeded with |
Decision Issued Date 22/03/2021 |
| Appeal Received Date |
Appeal Start Date |
| Appeal Decision |
Appeal Decision Date |
| Applicant Oxfordshire Highway Authority |
| Applicant's Address County Hall
New Road
Oxford
OX1 1ND |
|
Agent
Mr Barry Dodman-Edwards
|
|
Agents's Address
County Hall
New Road
Oxford
OX1 1ND
|
Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.
Neighbour List
| No associated neighbours |
Consultee List
| No associated consultees |
| No Public Notices |
To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.
| Document Type | Date | Description | File Size | Drawing/Rev Number | |
|---|---|---|---|---|---|
| Application Forms | |||||
| Application Documents | 23/03/2020 | app form | (77kb) | - | |
| Application Documents | 29/01/2021 | Neighbour Map | (103kb) | - | |
| Supporting Documents | |||||
| Supporting Documents | 23/03/2020 | D&A statement | (2993kb) | - | |
| Site Plans | |||||
| Plans - Site | 29/01/2021 | Site Location Plan | (393kb) | 570130-SKA-SBR-075-DR-CB-0022-D2-T-0 - | |
| Plans - Site | 29/01/2021 | Site Plan 1 of 3 | (278kb) | 570130-SKA-SBR-075-DR-CB-0023-D2-T-0 - | |
| Plans - Site | 29/01/2021 | Site Plan 2 of 3 | (265kb) | 570130-SKA-SBR-075-DR-CB-0024-D2-T-0 - | |
| Plans - Site | 29/01/2021 | Site Plan 3 of 3 | (254kb) | 570130-SKA-SBR-075-DR-CB-0025-D2-T-0 - | |
| Application Forms | |||||
|---|---|---|---|---|---|
| Application Documents (77kb) - app form | |||||
| Application Documents (103kb) - Neighbour Map | |||||
| Supporting Documents | |||||
| Supporting Documents (2993kb) - D&A statement | |||||
| Site Plans | |||||
| Plans - Site (393kb) 570130-SKA-SBR-075-DR-CB-0022-D2-T-0 - Site Location Plan | |||||
| Plans - Site (278kb) 570130-SKA-SBR-075-DR-CB-0023-D2-T-0 - Site Plan 1 of 3 | |||||
| Plans - Site (265kb) 570130-SKA-SBR-075-DR-CB-0024-D2-T-0 - Site Plan 2 of 3 | |||||
| Plans - Site (254kb) 570130-SKA-SBR-075-DR-CB-0025-D2-T-0 - Site Plan 3 of 3 |
| Addresses |
|---|
| Heyford Bridge Station Road Lower Heyford |
Planning Applications | ||||||
| Application number | Valid Date | Application Type | Location | Proposal | Decision | Decision Issued Date |
|---|---|---|---|---|---|---|
| 20/00840/LB | 29/01/2021 | Listed Building | Heyford Bridge Station Road Lower Heyford | Stage 1 - 2020 - repair of previously collapsed sections of northern retaining wall; resurfacing carriageway to provide fall to north side; installation of longitudinal channel drainage on the north side using existing outfalls supplemented with additional outfalls of the same design; prevention of seepage into arches 1 to 4 (the main river arches); Stage 2 - 2021 (provided Stage 1 was successful) - repair and repointing of Arches 1 to 4 including replacement stone ribs and removal of 20th century partial brick cladding to intrados; northern cutwaters to Arches 1 to 4 including removal of cement render and brick repairs to stonework; repointing and repairing stonework on north and south elevations of Arches 1 to 4 and approximately 20% of the remaining elevations | Not proceeded with | 22/03/2021 |
| 23/01432/LB | 31/05/2023 | Listed Building | Heyford Bridge Station Road Lower Heyford | The works are initially proposed to be completed in two phases, with carriageway re-surfacing and drainage improvements now expected to be completed in early autumn 2023, following stonework repairs and re-pointing to the bridge elevations, and the rebuilding of the collapsed areas prior in Summer 2023. Repairs to the intrados’ of arches 1-4 shall be completed as Phase 2 in Summer 2024 under a bat mitigation license. | Permitted | 26/09/2023 |