Track this application
| Application Number 17/02414/F |
Application Type Full Development |
| Status Application Withdrawn |
Decision Level |
| Location Land To The South And Adj To
South Side
Steeple Aston |
|
| Proposal Erection of 6 no. two-storey residential dwellings with access off South Side, including parking and garaging, landscaping and all enabling and ancillary works. |
|
| Parish Steeple Aston |
Ward Deddington |
| Received Date 30/11/2017 |
Valid Date 21/12/2017 |
| Weekly List Date |
Comments Due Date 01/02/2018 |
| Target Decision Date 15/02/2018 |
Committee Date |
| Decision Application Withdrawn |
Decision Issued Date 15/02/2018 |
| Appeal Received Date |
Appeal Start Date |
| Appeal Decision |
Appeal Decision Date |
| Applicant Rectory Homes Ltd |
| Applicant's Address Miss Amy Atkins
Rectory House
Thame Road
Haddenham
HP17 8DA |
|
Agent |
|
Agents's Address |
Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.
Neighbour List
| Address | Consult Date | Reply Due | Reply Received | Re-Consult Date | Reply Due | Reply Date |
|---|---|---|---|---|---|---|
| Address7 Bradshaw Close Steeple Aston Bicester OX25 4SA | Consult Date | Reply Due | Reply Received13/01/2018 | Re-Consult Date | Reply Due | Reply Date13/01/2018 |
| AddressPrimrose Gardens North Side Steeple Aston Oxfordshire OX25 4SE | Consult Date | Reply Due | Reply Received08/01/2018 | Re-Consult Date | Reply Due | Reply Date08/01/2018 |
| Address2 Bradshaw Close Steeple Aston Bicester OX25 4SA | Consult Date | Reply Due | Reply Received10/01/2018 | Re-Consult Date | Reply Due | Reply Date10/01/2018 |
| AddressThe Rise South Side Steeple Aston Oxfordshire OX25 4RU | Consult Date | Reply Due | Reply Received16/01/2018 | Re-Consult Date | Reply Due | Reply Date16/01/2018 |
| AddressCrimond South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressCedar Court Water Lane Steeple Aston Bicester OX25 4SB | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressFlat 3 Hill House South Side Steeple Aston Bicester OX25 4SD | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressFlat 7 Hill House South Side Steeple Aston Bicester OX25 4SD | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressHill Copse South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressSouthside Cottage South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressFlat Red Lion South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressThe Lodge South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressSteve Ward Autos Workshop Adjacent Telephone Exchange South Side Steeple Aston Bicester OX25 5RX | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressRed Lion South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressHouse Red Lion Corner South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressFlat 1 Hill House South Side Steeple Aston Bicester OX25 4SD | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressFlat 2 Hill House South Side Steeple Aston Bicester OX25 4SD | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressFlat 5 Hill House South Side Steeple Aston Bicester OX25 4SD | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressFlat 6 Hill House South Side Steeple Aston Bicester OX25 4SD | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | Re-Consult Date | Reply Due | Reply Date |
| AddressFlat 8 Hill House South Side Steeple Aston Bicester OX25 4SD | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received19/01/2018 | Re-Consult Date | Reply Due | Reply Date19/01/2018 |
| AddressFlat 4 Hill House South Side Steeple Aston Bicester OX25 4SD | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received18/01/2018 | Re-Consult Date | Reply Due | Reply Date18/01/2018 |
| AddressKiftsgate House South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received17/01/2018 | Re-Consult Date | Reply Due | Reply Date17/01/2018 |
| AddressThe Coach House South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received20/01/2018 | Re-Consult Date | Reply Due | Reply Date20/01/2018 |
| AddressMulberry House South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received23/01/2018 | Re-Consult Date | Reply Due | Reply Date23/01/2018 |
| AddressCherry Tree South Side Steeple Aston Bicester OX25 4RY | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received15/01/2018 | Re-Consult Date | Reply Due | Reply Date15/01/2018 |
Consultee List
| Name | Address | Consult Date | Reply Due | Reply Received | Type |
|---|---|---|---|---|---|
| NameArboriculture (CDC) | Address | Consult Date03/01/2018 | Reply Due17/01/2018 | Reply Received | TypeStandard Consultee |
| NameConservation (CDC) | Address | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | TypeStandard Consultee |
| NameEcology (CDC) | Address | Consult Date03/01/2018 | Reply Due17/01/2018 | Reply Received18/01/2018 | TypeStandard Consultee |
| NameEnvironmental Health (CDC) | Address | Consult Date03/01/2018 | Reply Due17/01/2018 | Reply Received05/01/2018 | TypeStandard Consultee |
| NameLead Local Flood Authority OCC Drainage | Address | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | TypeStandard Consultee |
| NameLocal Highways Authority OCC | Address | Consult Date03/01/2018 | Reply Due17/01/2018 | Reply Received | TypeStandard Consultee |
| NameNatural England | AddressConsultation Services Hornbeam House Electra Way CREWE CW1 6GJ | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received17/01/2018 | TypeStandard Consultee |
| NameSteeple Aston Parish Council | AddressWestfield Farm Cottage Fenway Steeple Aston BICESTER OX25 4SS | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received17/01/2018 | TypeStandard Consultee |
| NameStrategic Housing Officer - Strategic Housing (CDC) | AddressAffordable Housing | Consult Date03/01/2018 | Reply Due17/01/2018 | Reply Received04/01/2018 | TypeStandard Consultee |
| NameThames Water | AddressDevelopment Planning Asset Investment Unit Maple Lodge Denham Way RICKMANSWORTH WD3 9SQ | Consult Date03/01/2018 | Reply Due24/01/2018 | Reply Received | TypeStandard Consultee |
| NameLocal Highways Authority OCC | Address | Consult Date04/01/2018 | Reply Due18/01/2018 | Reply Received25/01/2018 | TypeRe-consult |
| NameSteeple Aston Parish Council | AddressWestfield Farm Cottage Fenway Steeple Aston BICESTER OX25 4SS | Consult Date04/01/2018 | Reply Due25/01/2018 | Reply Received | TypeRe-consult |
| Description | Display Date | Expiry Date | Notice Type |
|---|---|---|---|
| DescriptionSite Notice for F and ADV | Display Date05/01/2018 | Expiry Date26/01/2018 | Notice Type |
| DescriptionBanbury Guardian | Display Date11/01/2018 | Expiry Date01/02/2018 | Notice Type |
To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.
| Document Type | Date | Description | File Size | Drawing/Rev Number | |
|---|---|---|---|---|---|
| Application Forms | |||||
| Application Document | 05/01/2018 | Amended Publicity | (0kb) | - | |
| Application Document | 05/01/2018 | Publicity | (0kb) | - | |
| Application Document | 22/12/2017 | drawing register | (0kb) | - | |
| Application Document | 22/12/2017 | app form | (0kb) | - | |
| Application Document | 07/12/2017 | Info/Species Map | (0kb) | - | |
| Application Document | 07/12/2017 | Constraints | (0kb) | - | |
| Application Document | 07/12/2017 | Neighbour List | (0kb) | - | |
| Application Document | 07/12/2017 | Neighbour Map | (0kb) | - | |
| Application Document | 22/02/2018 | site visit | (0kb) | - | |
| Application Document | 21/12/2017 | Checklist | (0kb) | - | |
| Application Document | 12/01/2018 | Amended Publicity | (0kb) | - | |
| Supporting Documents | |||||
| Flood Risk Assessment | 22/12/2017 | Flood Risk Assessment Development drainage strategy | (0kb) | - | |
| Supporting Documents | 04/01/2018 | Access Appraisal | (0kb) | - | |
| Supporting Documents | 22/12/2017 | Habitat Survey | (0kb) | - | |
| Supporting Documents | 22/12/2017 | Arboricultural Assessment | (0kb) | - | |
| Supporting Documents | 22/12/2017 | Transport statement | (0kb) | - | |
| Supporting Documents | 22/12/2017 | Design & Access statement | (0kb) | - | |
| Supporting Documents | 22/12/2017 | Planning statement | (0kb) | - | |
| Supporting Documents | 22/12/2017 | SUDS Management & Maitenance Plan | (0kb) | - | |
| Site Plans | |||||
| Plans – Block Plan/Site Layout | 22/12/2017 | proposed site plan | (0kb) | - | |
| Site Location Plan | 22/12/2017 | location plan | (0kb) | - | |
| Existing Plans | |||||
| Plans – Sections/Surveys | 22/12/2017 | site survey | (0kb) | - | |
| Plans – Sections/Surveys | 22/12/2017 | Site survey | (0kb) | - | |
| Proposed Plans | |||||
| Plans – Floor Plans/Elevations | 22/12/2017 | plot 6 plans & elevations | (0kb) | - | |
| Plans – Floor Plans/Elevations | 22/12/2017 | plot 5 plans & elevatins | (0kb) | - | |
| Plans – Floor Plans/Elevations | 22/12/2017 | plot 4 plans & elevations | (0kb) | - | |
| Plans – Floor Plans/Elevations | 22/12/2017 | plot 3 plans & elevations | (0kb) | - | |
| Plans – Floor Plans/Elevations | 22/12/2017 | plot 2 plans & elevations | (0kb) | - | |
| Plans – Floor Plans/Elevations | 22/12/2017 | plot 1 plans & elevations | (0kb) | - | |
| Plans – Floor Plans/Elevations | 22/12/2017 | Car port plans & elevations | (0kb) | - | |
| Plans – Miscellaneous | 22/12/2017 | proposed street scene | (0kb) | - | |
| Plans – Miscellaneous | 22/12/2017 | Materials plan | (0kb) | - | |
| Consultee Responses | |||||
| Consultation Response | 04/01/2018 | Strategic Housing - 04.01.18 | (0kb) | - | |
| Consultation Response | 18/01/2018 | Mid Cherwell Neighbourhood Forum 18.01.18 | (0kb) | - | |
| Consultation Response | 18/01/2018 | CDC Ecology - 18.01.18 | (0kb) | - | |
| Consultation Response | 18/01/2018 | Natural England - 17.01.18 | (0kb) | - | |
| Consultation Response | 17/01/2018 | Steeple Aston Parish Council 17.01.18 | (0kb) | - | |
| Consultation Response | 26/01/2018 | OCC Highways 25.01.18 | (0kb) | - | |
| Consultation Response | 24/01/2018 | Environmental Protection further comments - 23.01.18 | (0kb) | - | |
| Consultation Response | 23/01/2018 | Environmental Protection - 23.01.18 | (0kb) | - | |
| Public Comments | |||||
| Public Comments | 16/01/2018 | Bonwick, A 15.01.18 | (0kb) | - | |
| Public Comments | 10/01/2018 | Preston, R 08/01/18 | (0kb) | - | |
| Public Comments | 05/01/2018 | Environmental Protection 05.01.18 | (0kb) | - | |
| Public Comments | 23/01/2018 | Lang, Tim - 23.01.18 | (0kb) | - | |
| Public Comments | 23/01/2018 | Baglin-Jones 18/1/18 | (0kb) | - | |
| Public Comments | 22/01/2018 | Sinclair, A - 20.01.18 | (0kb) | - | |
| Public Comments | 17/01/2018 | G Dailey 13-01-18 | (0kb) | - | |
| Public Comments | 16/01/2018 | Wilkins, B 13.01.2018 | (0kb) | - | |
| Public Comments | 23/01/2018 | Returned envelope 18/1/17 | (0kb) | - | |
| Public Comments | 18/01/2018 | McGee, F 17.01.18 | (0kb) | - | |
| Public Comments | 18/01/2018 | McKinley, C - 16.01.18 | (0kb) | - | |
| Public Comments | 12/01/2018 | Cummins, S 10/01/18 | (0kb) | - | |
| Decision and Legal Agreements | |||||
| Decision | 15/02/2018 | Withdrawn - 15.02.18 | (0kb) | - | |
| Application Forms | |||||
|---|---|---|---|---|---|
| Application Document (0kb) - Amended Publicity | |||||
| Application Document (0kb) - Publicity | |||||
| Application Document (0kb) - drawing register | |||||
| Application Document (0kb) - app form | |||||
| Application Document (0kb) - Info/Species Map | |||||
| Application Document (0kb) - Constraints | |||||
| Application Document (0kb) - Neighbour List | |||||
| Application Document (0kb) - Neighbour Map | |||||
| Application Document (0kb) - site visit | |||||
| Application Document (0kb) - Checklist | |||||
| Application Document (0kb) - Amended Publicity | |||||
| Supporting Documents | |||||
| Flood Risk Assessment (0kb) - Flood Risk Assessment Development drainage strategy | |||||
| Supporting Documents (0kb) - Access Appraisal | |||||
| Supporting Documents (0kb) - Habitat Survey | |||||
| Supporting Documents (0kb) - Arboricultural Assessment | |||||
| Supporting Documents (0kb) - Transport statement | |||||
| Supporting Documents (0kb) - Design & Access statement | |||||
| Supporting Documents (0kb) - Planning statement | |||||
| Supporting Documents (0kb) - SUDS Management & Maitenance Plan | |||||
| Site Plans | |||||
| Plans – Block Plan/Site Layout (0kb) - proposed site plan | |||||
| Site Location Plan (0kb) - location plan | |||||
| Existing Plans | |||||
| Plans – Sections/Surveys (0kb) - site survey | |||||
| Plans – Sections/Surveys (0kb) - Site survey | |||||
| Proposed Plans | |||||
| Plans – Floor Plans/Elevations (0kb) - plot 6 plans & elevations | |||||
| Plans – Floor Plans/Elevations (0kb) - plot 5 plans & elevatins | |||||
| Plans – Floor Plans/Elevations (0kb) - plot 4 plans & elevations | |||||
| Plans – Floor Plans/Elevations (0kb) - plot 3 plans & elevations | |||||
| Plans – Floor Plans/Elevations (0kb) - plot 2 plans & elevations | |||||
| Plans – Floor Plans/Elevations (0kb) - plot 1 plans & elevations | |||||
| Plans – Floor Plans/Elevations (0kb) - Car port plans & elevations | |||||
| Plans – Miscellaneous (0kb) - proposed street scene | |||||
| Plans – Miscellaneous (0kb) - Materials plan | |||||
| Consultee Responses | |||||
| Consultation Response (0kb) - Strategic Housing - 04.01.18 | |||||
| Consultation Response (0kb) - Mid Cherwell Neighbourhood Forum 18.01.18 | |||||
| Consultation Response (0kb) - CDC Ecology - 18.01.18 | |||||
| Consultation Response (0kb) - Natural England - 17.01.18 | |||||
| Consultation Response (0kb) - Steeple Aston Parish Council 17.01.18 | |||||
| Consultation Response (0kb) - OCC Highways 25.01.18 | |||||
| Consultation Response (0kb) - Environmental Protection further comments - 23.01.18 | |||||
| Consultation Response (0kb) - Environmental Protection - 23.01.18 | |||||
| Public Comments | |||||
| Public Comments (0kb) - Bonwick, A 15.01.18 | |||||
| Public Comments (0kb) - Preston, R 08/01/18 | |||||
| Public Comments (0kb) - Environmental Protection 05.01.18 | |||||
| Public Comments (0kb) - Lang, Tim - 23.01.18 | |||||
| Public Comments (0kb) - Baglin-Jones 18/1/18 | |||||
| Public Comments (0kb) - Sinclair, A - 20.01.18 | |||||
| Public Comments (0kb) - G Dailey 13-01-18 | |||||
| Public Comments (0kb) - Wilkins, B 13.01.2018 | |||||
| Public Comments (0kb) - Returned envelope 18/1/17 | |||||
| Public Comments (0kb) - McGee, F 17.01.18 | |||||
| Public Comments (0kb) - McKinley, C - 16.01.18 | |||||
| Public Comments (0kb) - Cummins, S 10/01/18 | |||||
| Decision and Legal Agreements | |||||
| Decision (0kb) - Withdrawn - 15.02.18 |
| Addresses |
|---|
| Land To The South And Adj To South Side Steeple Aston |
Planning Applications | ||||||
| Application number | Valid Date | Application Type | Location | Proposal | Decision | Decision Issued Date |
|---|---|---|---|---|---|---|
| 17/02414/F | 21/12/2017 | Full Development | Land To The South And Adj To South Side Steeple Aston | Erection of 6 no. two-storey residential dwellings with access off South Side, including parking and garaging, landscaping and all enabling and ancillary works. | Application Withdrawn | 15/02/2018 |
| 18/01482/F | 17/08/2018 | Full Development | Land To The South And Adj To South Side Steeple Aston | Erection of 6 no. two-storey residential dwellings with access off South Side, including parking and garaging, landscaping and all enabling and ancillary works. | Application Withdrawn | 01/10/2018 |
| 19/01177/F | 26/06/2019 | Full Development | Land To The South And Adj To South Side Steeple Aston | Erection of 10 no. two-storey residential dwellings with access off South Side, including a new pedestrian footway, parking and garaging, landscaping, and all enabling and ancillary works. | Application Withdrawn | 29/08/2019 |
| 19/00044/SO | 28/06/2019 | Screening Opinion | Land To The South And Adj To South Side Steeple Aston | Erection of 10 no. two-storey residential dwellings with access off South Side, including a new pedestrian footway, parking and garaging, landscaping, and all enabling and ancillary works. | Screening Opinion not requesting EIA | 22/08/2019 |
| 19/02948/F | 09/01/2020 | Full Development | Land To The South And Adj To South Side Steeple Aston | Erection of 10no. two storey residential dwellings with access off South Side including a new pedestrian footway, parking and garaging, landscaping and all enabling and ancillary works | Permitted | 28/06/2021 |
| 19/03000/SO | 09/01/2020 | Screening Opinion | Land To The South And Adj To South Side Steeple Aston | Screening opinion to 19/02948/F - Erection of 10 No two storey residential dwellings with access off South Side including a new pedestrian footway, parking and garaging, landscaping and all enabling and ancillary works | Screening Opinion not requesting EIA | 17/01/2020 |
| 21/02318/F | 02/07/2021 | Full Development | Land To The South And Adj To South Side Steeple Aston | Variation of Condition 2 (plans) of 19/02948/F - for plots 1, 2, 3, 4, 5, 6, 7 and 10 | Permitted | 26/01/2022 |
| 21/02319/DISC | 02/07/2021 | Discharge Of Conditions | Land To The South And Adj To South Side Steeple Aston | Discharge of Conditions 10 (Construction Traffic Management Plan), 11 (Construction Environmental Management Plan), 12 (Biodiversity Enhancement) and 16 (Contamination Study) of 19/02948/F | Permitted | 11/01/2022 |
| 21/02496/DISC | 20/07/2021 | Discharge Of Conditions | Land To The South And Adj To South Side Steeple Aston | Discharge of Conditions 5 (surface water drainage details), 8 (full specification details of parking and manoeuvring areas) and 9 (full specification details of accesses, driveways and turning areas) of 19/02948/F | Permitted | 04/07/2022 |
| 21/02599/DISC | 30/07/2021 | Discharge Of Conditions | Land To The South And Adj To South Side Steeple Aston | Discharge of Conditions 4 (architectural details), 13 (landscaping) & 15 (EV charging points) of 19/02948/F | Permitted | 26/01/2022 |
| 21/03462/OBL | 27/09/2021 | Obligation | Land To The South And Adj To South Side Steeple Aston | Discharge of clause 4.1.1 of the third schedule of the Section 106 Agreement in respect of this application. The Management & Maintenance Plan was also submitted for approval as part of discharge of condition 13 (19/02948/F). | Permitted | 17/02/2022 |
| 22/00488/DISC | 18/02/2022 | Discharge Of Conditions | Land To The South And Adj To South Side Steeple Aston | Discharge of Condition 3 (stone sample panel) of 21/02318/F | Permitted | 29/04/2022 |
| 22/01126/DISC | 13/04/2022 | Discharge Of Conditions | Land To The South And Adj To South Side Steeple Aston | Discharge of Conditions 5 (drainage details) & 9 (driveways, accesses and turning areas) of 21/02318/F | Permitted | 04/07/2022 |
| 22/01788/F | 16/06/2022 | Full Development | Land To The South And Adj To South Side Steeple Aston | Variation of condition 2 (plans) of 21/02318/F - proposed amendments to plot 10 | Permitted | 14/09/2022 |
| 22/03397/DISC | 10/11/2022 | Discharge Of Conditions | Land To The South And Adj To South Side Steeple Aston | Discharge of Condition 6 (record of installed SUDS) of 22/01788/F | Permitted | 15/05/2023 |
| 23/01851/NMA | 05/07/2023 | Non Material Amendments | Land To The South And Adj To South Side Steeple Aston | Show a 300mm difference in ridge heights between plots 8 and 9 due to the difference in finished floor levels (proposed as non-material amendment to 22/01788/F) | Permitted | 25/07/2023 |
| 23/01852/DISC | 17/07/2023 | Discharge Of Conditions | Land To The South And Adj To South Side Steeple Aston | Discharge of Condition 13 (landscaping details) of 19/02948/F | Permitted | 11/09/2023 |