Planning register

Planning Application - 16/01418/F

Skip to tab headings. Skip to tab content.

Application Number
16/01418/F
Application Type
Full Development
Status
Application Permitted
Decision Level
Delegated
Location
The Electricity Network Company Bicester North Sub Station Skimmingdish Lane Caversfield Oxfordshire
Proposal
Construction of new electricity sub-station and access off Skimmingdish Lane
Parish
Launton
Ward
Launton And Otmoor
Received Date
15/07/2016
Valid Date
01/08/2016
Weekly List Date
Comments Due Date
30/08/2016
Target Decision Date
28/09/2016
Committee Date
Decision
Permitted
Decision Issued Date
27/09/2016
Appeal Received Date
Appeal Start Date
Appeal Decision
Appeal Decision Date
Applicant
Scottish And Southern Energy Power Distribution
Applicant's Address
Mr Chris Boden 55 Vastern Road Reading RG1 8BU
Agent
Glanville Consultants
Agents's Address
Mr Jan Zelisko Cornerstone House 62 Foxhall Road Didcot OX11 7AD

Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.


Neighbour List
Address Consult Date Reply Due Reply Received Re-Consult Date Reply Due Reply Date
Address10 Woodpecker Close Bicester Oxfordshire OX26 6WY Consult Date Reply Due Reply Received25/08/2016 Re-Consult Date Reply Due Reply Date25/08/2016
Address9 - 11 Church Street Bicester OX26 6AY Consult Date Reply Due Reply Received15/08/2016 Re-Consult Date Reply Due Reply Date15/08/2016
Address36 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address30 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address52 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address50 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address1 Fulmar Court Bicester OX26 4FG Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address20 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address44 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address10 Tangmere Close Bicester OX26 4YZ Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address9 Tangmere Close Bicester OX26 4YZ Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address2 Fulmar Court Bicester OX26 4FG Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address42 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address34 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address32 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address26 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address19 Tangmere Close Bicester OX26 4YZ Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address16 Tangmere Close Bicester OX26 4YZ Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address48 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address46 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address17 Tangmere Close Bicester OX26 4YZ Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address8 Tangmere Close Bicester OX26 4YZ Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address1 Sunderland Drive Bicester OX26 4FJ Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address3 Fulmar Court Bicester OX26 4FG Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address40 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address38 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received Re-Consult Date Reply Due Reply Date
Address22 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received16/08/2016 Re-Consult Date Reply Due Reply Date16/08/2016
Address24 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received10/08/2016 Re-Consult Date Reply Due Reply Date10/08/2016
Address28 Duxford Close Bicester OX26 4FW Consult Date26/07/2016 Reply Due16/08/2016 Reply Received15/08/2016 Re-Consult Date Reply Due Reply Date15/08/2016

Consultee List
Name Address Consult Date Reply Due Reply Received Type
NameAnti-social Behaviour (CDC) Address Consult Date26/07/2016 Reply Due09/08/2016 Reply Received TypeStandard Consultee
NameArboriculture (CDC) Address Consult Date26/07/2016 Reply Due09/08/2016 Reply Received TypeStandard Consultee
NameBBO Wildlife Trust AddressThe Lodge 1 Armstrong Road Littlemore OXFORD OX4 4XT Consult Date26/07/2016 Reply Due16/08/2016 Reply Received TypeStandard Consultee
NameConservation (CDC) Address Consult Date26/07/2016 Reply Due09/08/2016 Reply Received12/09/2016 TypeStandard Consultee
NameContaminated Land (CDC) Address Consult Date26/07/2016 Reply Due09/08/2016 Reply Received10/08/2016 TypeStandard Consultee
NameEcology (CDC) Address Consult Date26/07/2016 Reply Due09/08/2016 Reply Received TypeStandard Consultee
NameLandscapes Officer - Landscape Services (CDC) AddressInformal Open Space/Play Facilities Consult Date26/07/2016 Reply Due09/08/2016 Reply Received04/08/2016 TypeStandard Consultee
NameLaunton Parish Council Address13 Oak Close BICESTER OX26 3XD Consult Date26/07/2016 Reply Due16/08/2016 Reply Received05/08/2016 TypeStandard Consultee
NameOxfordshire County Council AddressMajor Planning Applications Team Oxfordshire County Council County Hall New Road Oxford OX1 1ND Consult Date26/07/2016 Reply Due16/08/2016 Reply Received26/08/2016 TypeStandard Consultee
NamePlanning Policy (CDC) Address Consult Date26/07/2016 Reply Due09/08/2016 Reply Received26/08/2016 TypeStandard Consultee
Public Notices
Description Display Date Expiry Date Notice Type
DescriptionBicester Advertiser Display Date04/08/2016 Expiry Date25/08/2016 Notice Type
DescriptionSite Notice General Display Date09/08/2016 Expiry Date30/08/2016 Notice Type

To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.

Document Type Date Description File Size Drawing/Rev Number
Application Forms
Application Document 26/07/2016 CIL Questionnaire (0kb) -
Application Document 25/07/2016 Info map (0kb) -
Application Document 25/07/2016 Info map (0kb) -
Application Document 25/07/2016 Neighbour map (0kb) -
Application Document 25/07/2016 Neighbour list (0kb) -
Application Document 25/07/2016 Checklist (0kb) -
Application Document 28/04/2017 Cons 3/4/8/9/10/5/16 - Publicity (0kb) -
Application Document 05/12/2016 Con 18,21-23 - Publicity (0kb) -
Application Document 17/11/2016 Con 18,21-23 - Publicity (0kb) -
Application Document 15/11/2016 Cons 18/21/22/23 App form (0kb) -
Application Document 17/10/2016 site visit (0kb) -
Application Document 26/07/2016 App form (0kb) -
Application Document 05/04/2017 Con 19 - Publicity (0kb) -
Application Document 26/07/2016 Publicity (0kb) -
Application Document 27/03/2017 Con 19 App form (0kb) -
Application Document 27/04/2017 Cons 3/4/8/9/10/5/16 Email from Richard Oram (0kb) -
Application Document 27/04/2017 Cons 3/4/8/9/10/5/16 App form (0kb) -
Supporting Documents
Supporting Documents 26/07/2016 Exsplosive Ordanance Threat Assessment (0kb) -
Supporting Documents 26/07/2016 Presentation to CDC & OCC 2 of 2 (0kb) -
Supporting Documents 26/07/2016 Presentation to CDC & OCC 1 of 2 (0kb) -
Supporting Documents 26/07/2016 Ground investigation report P4 (0kb) -
Supporting Documents 26/07/2016 Ground investigation report P3 (0kb) -
Supporting Documents 26/07/2016 Ground investigation report P2 (0kb) -
Supporting Documents 26/07/2016 Ground investigation report P1 (0kb) -
Supporting Documents 26/07/2016 Ground investigation report (0kb) -
Supporting Documents 26/07/2016 EcoCheck (0kb) -
Supporting Documents 26/07/2016 Design & Access statement (0kb) -
Supporting Documents 26/07/2016 Eclological assessment (0kb) -
Supporting Documents 26/07/2016 Landscape & Ecological management plan (0kb) -
Supporting Documents 26/07/2016 Reptile report (0kb) -
Supporting Documents 26/07/2016 Historic environment desk based assessment P3 (0kb) -
Supporting Documents 26/07/2016 Historic environment desk based assessment P2 (0kb) -
Supporting Documents 26/07/2016 Historic Environment desk based assessment P1 (0kb) -
Supporting Documents 26/07/2016 Arboricultural planning statement P5 (0kb) -
Supporting Documents 26/07/2016 Arboricultural planning statement P4 (0kb) -
Supporting Documents 26/07/2016 Arboricultural planning statement P3 (0kb) -
Supporting Documents 15/11/2016 Cons 18/21/22/23 Construction environmental management plan (0kb) -
Supporting Documents 26/07/2016 Arboricultural planning statement P2 (0kb) -
Supporting Documents 26/07/2016 Arboricultural planning statement P1 (0kb) -
Supporting Documents 26/07/2016 Noise survey (0kb) -
Supporting Documents 15/11/2016 Cons 18/21/22/23 Landscape ecological management plan (0kb) -
Supporting Documents 27/04/2017 Cons 3/4/8/9/10/5/16 Written scheme of Investigation (0kb) -
Supporting Documents 27/04/2017 Cons 3/4/8/9/10/5/16 Landscape management plan (0kb) -
Site Plans
Plans – Block Plan/Site Layout 26/07/2016 Proposed site plan (0kb) -
Plans – Block Plan/Site Layout 30/06/2017 Cons 3/4/5/8/9/16 AMD proposed site plan (0kb) -
Site Location Plan 15/11/2016 Cons 18/21/22/23 Location of bat/bird & invertebrate boxes (0kb) -
Site Location Plan 26/07/2016 SUPP - Location Plan (0kb) -
Site Location Plan 03/08/2016 AMD Location plan (0kb) -
Existing Plans
Plans – Sections/Surveys 26/07/2016 New switch house Long Section (0kb) -
Plans – Sections/Surveys 26/07/2016 New switch house Sections CC & DD (0kb) -
Plans – Sections/Surveys 26/07/2016 New switch house Sections AA & BB (0kb) -
Plans – Sections/Surveys 26/07/2016 Site survey (0kb) -
Proposed Plans
Plans – Floor Plans/Elevations 26/07/2016 New substation Site elevations (0kb) -
Plans – Floor Plans/Elevations 26/07/2016 New switch house first floor plan (0kb) -
Plans – Floor Plans/Elevations 26/07/2016 New switch house ground floor plan (0kb) -
Plans – Floor Plans/Elevations 26/07/2016 Switch house elevations C & D (0kb) -
Plans – Floor Plans/Elevations 26/07/2016 New switch house elevations A & B (0kb) -
Plans – Details 26/07/2016 Cable layout (0kb) -
Plans – Details 26/07/2016 New substation station Proposed drainage plan (0kb) -
Plans – Details 26/07/2016 Visibility Splay (0kb) -
Plans – Miscellaneous 30/06/2017 Cons 3/4/5/8/9/16 AMD Site entrance levels plan (0kb) -
Plans – Miscellaneous 27/04/2017 Cons 3/4/8/9/10/5/16 Visibility splay (0kb) -
Plans – Miscellaneous 27/04/2017 Cons 3/4/8/9/10/5/16 proposed drainage plan (0kb) -
Consultee Responses
Consultation Response 18/04/2017 Con 19 CDC Ecology - 13.04.17 (0kb) -
Consultation Response 12/09/2016 Landcsape Architect additional 12-09-16 (0kb) -
Consultation Response 30/06/2017 Cons 3/4/5/8/9/16 Extension of time request 29-06-17 (0kb) -
Consultation Response 30/06/2017 Con 8 OCC Drainage/Agent correspondance 29-06-17 (0kb) -
Consultation Response 12/09/2016 Conservation comments 12-09-16 (0kb) -
Consultation Response 30/08/2016 Planning policy comments 26-08-16 (0kb) -
Consultation Response 10/08/2016 OCCMAJ Extension of time - 10.08.16 (0kb) -
Consultation Response 17/05/2017 Cons 3/4/8/9/10/5/16 OCC 16-05-17 (0kb) -
Consultation Response 12/08/2016 Landscape Architect 04-08-16 (0kb) -
Consultation Response 10/08/2016 Contaminated Land 10.08.2016 (0kb) -
Consultation Response 24/01/2017 Con 18 - Ecology 23/1/16 (0kb) -
Consultation Response 24/01/2017 Cons 15/21/22/23 - Ecology 6/1/17 (0kb) -
Consultation Response 05/08/2016 Launton Parish Council - 05.08.16 (0kb) -
Consultation Response 27/03/2017 Con 19 Eciligy officer comments (0kb) -
Consultation Response 24/11/2016 Cons 18/21/22/23 Landscape officer comments 23-11-16 (0kb) -
Consultation Response 23/09/2016 Additional responce from OCC Highways 21-09-16 (0kb) -
Consultation Response 15/05/2017 Cons 3/4/8/9/10/16 Landscape Architect 04-05-17 (0kb) -
Consultation Response 09/05/2017 Conditions 9 & 10 - OCC Archaeology comments 05/05/17 (0kb) -
Consultation Response 09/05/2017 Cons 10/10 - OCC Archaeology 05/05/17 (0kb) -
Consultation Response 26/08/2016 OCCMAJ - 26.08.16 (0kb) -
Public Comments
Public Comments 16/08/2016 Kitching, A - 15.08.16 (0kb) -
Public Comments 15/08/2016 Roberts, P - 14.08.16 (0kb) -
Public Comments 17/08/2016 Hutchinson, D - 16.08.16 (0kb) -
Public Comments 11/08/2016 Maycock, C - 10.08.16 (0kb) -
Public Comments 25/08/2016 Clissold, P - 25.08.16 (0kb) -
Officer/Committee Consideration
Officer Report 18/04/2017 Con 19 Report - 18.04.17 (0kb) -
Officer Report 24/01/2017 Cons 18, 21, 22, 23 Case Officers report - 24.01.17 (0kb) -
Officer Report 27/09/2016 Report - 27.09.16 (0kb) -
Officer Report 03/07/2017 Cons 3, 4, 5, 8, 9, 16 Case Officer Report - 03.07.17 (0kb) -
Decision and Legal Agreements
Decision 18/04/2017 Con 19 - 18.04.17 (0kb) -
Decision 24/01/2017 Cons 18, 21, 22, 23 Decision - 24.01.17 (0kb) -
Decision 27/09/2016 27.09.16 (0kb) -
Decision 03/07/2017 Cons 3, 4, 5, 8, 9, 16 Decision - 03.07.17 (0kb) -
Planning Application Documents
Superseded 27/04/2017 Cons 3/4/8/9/10/5/16 SUPP Proposed site plan (0kb) -
Application Forms
Application Document (0kb) - CIL Questionnaire
Application Document (0kb) - Info map
Application Document (0kb) - Info map
Application Document (0kb) - Neighbour map
Application Document (0kb) - Neighbour list
Application Document (0kb) - Checklist
Application Document (0kb) - Cons 3/4/8/9/10/5/16 - Publicity
Application Document (0kb) - Con 18,21-23 - Publicity
Application Document (0kb) - Con 18,21-23 - Publicity
Application Document (0kb) - Cons 18/21/22/23 App form
Application Document (0kb) - site visit
Application Document (0kb) - App form
Application Document (0kb) - Con 19 - Publicity
Application Document (0kb) - Publicity
Application Document (0kb) - Con 19 App form
Application Document (0kb) - Cons 3/4/8/9/10/5/16 Email from Richard Oram
Application Document (0kb) - Cons 3/4/8/9/10/5/16 App form
Supporting Documents
Supporting Documents (0kb) - Exsplosive Ordanance Threat Assessment
Supporting Documents (0kb) - Presentation to CDC & OCC 2 of 2
Supporting Documents (0kb) - Presentation to CDC & OCC 1 of 2
Supporting Documents (0kb) - Ground investigation report P4
Supporting Documents (0kb) - Ground investigation report P3
Supporting Documents (0kb) - Ground investigation report P2
Supporting Documents (0kb) - Ground investigation report P1
Supporting Documents (0kb) - Ground investigation report
Supporting Documents (0kb) - EcoCheck
Supporting Documents (0kb) - Design & Access statement
Supporting Documents (0kb) - Eclological assessment
Supporting Documents (0kb) - Landscape & Ecological management plan
Supporting Documents (0kb) - Reptile report
Supporting Documents (0kb) - Historic environment desk based assessment P3
Supporting Documents (0kb) - Historic environment desk based assessment P2
Supporting Documents (0kb) - Historic Environment desk based assessment P1
Supporting Documents (0kb) - Arboricultural planning statement P5
Supporting Documents (0kb) - Arboricultural planning statement P4
Supporting Documents (0kb) - Arboricultural planning statement P3
Supporting Documents (0kb) - Cons 18/21/22/23 Construction environmental management plan
Supporting Documents (0kb) - Arboricultural planning statement P2
Supporting Documents (0kb) - Arboricultural planning statement P1
Supporting Documents (0kb) - Noise survey
Supporting Documents (0kb) - Cons 18/21/22/23 Landscape ecological management plan
Supporting Documents (0kb) - Cons 3/4/8/9/10/5/16 Written scheme of Investigation
Supporting Documents (0kb) - Cons 3/4/8/9/10/5/16 Landscape management plan
Site Plans
Plans – Block Plan/Site Layout (0kb) - Proposed site plan
Plans – Block Plan/Site Layout (0kb) - Cons 3/4/5/8/9/16 AMD proposed site plan
Site Location Plan (0kb) - Cons 18/21/22/23 Location of bat/bird & invertebrate boxes
Site Location Plan (0kb) - SUPP - Location Plan
Site Location Plan (0kb) - AMD Location plan
Existing Plans
Plans – Sections/Surveys (0kb) - New switch house Long Section
Plans – Sections/Surveys (0kb) - New switch house Sections CC & DD
Plans – Sections/Surveys (0kb) - New switch house Sections AA & BB
Plans – Sections/Surveys (0kb) - Site survey
Proposed Plans
Plans – Floor Plans/Elevations (0kb) - New substation Site elevations
Plans – Floor Plans/Elevations (0kb) - New switch house first floor plan
Plans – Floor Plans/Elevations (0kb) - New switch house ground floor plan
Plans – Floor Plans/Elevations (0kb) - Switch house elevations C & D
Plans – Floor Plans/Elevations (0kb) - New switch house elevations A & B
Plans – Details (0kb) - Cable layout
Plans – Details (0kb) - New substation station Proposed drainage plan
Plans – Details (0kb) - Visibility Splay
Plans – Miscellaneous (0kb) - Cons 3/4/5/8/9/16 AMD Site entrance levels plan
Plans – Miscellaneous (0kb) - Cons 3/4/8/9/10/5/16 Visibility splay
Plans – Miscellaneous (0kb) - Cons 3/4/8/9/10/5/16 proposed drainage plan
Consultee Responses
Consultation Response (0kb) - Con 19 CDC Ecology - 13.04.17
Consultation Response (0kb) - Landcsape Architect additional 12-09-16
Consultation Response (0kb) - Cons 3/4/5/8/9/16 Extension of time request 29-06-17
Consultation Response (0kb) - Con 8 OCC Drainage/Agent correspondance 29-06-17
Consultation Response (0kb) - Conservation comments 12-09-16
Consultation Response (0kb) - Planning policy comments 26-08-16
Consultation Response (0kb) - OCCMAJ Extension of time - 10.08.16
Consultation Response (0kb) - Cons 3/4/8/9/10/5/16 OCC 16-05-17
Consultation Response (0kb) - Landscape Architect 04-08-16
Consultation Response (0kb) - Contaminated Land 10.08.2016
Consultation Response (0kb) - Con 18 - Ecology 23/1/16
Consultation Response (0kb) - Cons 15/21/22/23 - Ecology 6/1/17
Consultation Response (0kb) - Launton Parish Council - 05.08.16
Consultation Response (0kb) - Con 19 Eciligy officer comments
Consultation Response (0kb) - Cons 18/21/22/23 Landscape officer comments 23-11-16
Consultation Response (0kb) - Additional responce from OCC Highways 21-09-16
Consultation Response (0kb) - Cons 3/4/8/9/10/16 Landscape Architect 04-05-17
Consultation Response (0kb) - Conditions 9 & 10 - OCC Archaeology comments 05/05/17
Consultation Response (0kb) - Cons 10/10 - OCC Archaeology 05/05/17
Consultation Response (0kb) - OCCMAJ - 26.08.16
Public Comments
Public Comments (0kb) - Kitching, A - 15.08.16
Public Comments (0kb) - Roberts, P - 14.08.16
Public Comments (0kb) - Hutchinson, D - 16.08.16
Public Comments (0kb) - Maycock, C - 10.08.16
Public Comments (0kb) - Clissold, P - 25.08.16
Officer/Committee Consideration
Officer Report (0kb) - Con 19 Report - 18.04.17
Officer Report (0kb) - Cons 18, 21, 22, 23 Case Officers report - 24.01.17
Officer Report (0kb) - Report - 27.09.16
Officer Report (0kb) - Cons 3, 4, 5, 8, 9, 16 Case Officer Report - 03.07.17
Decision and Legal Agreements
Decision (0kb) - Con 19 - 18.04.17
Decision (0kb) - Cons 18, 21, 22, 23 Decision - 24.01.17
Decision (0kb) - 27.09.16
Decision (0kb) - Cons 3, 4, 5, 8, 9, 16 Decision - 03.07.17
Planning Application Documents
Superseded (0kb) - Cons 3/4/8/9/10/5/16 SUPP Proposed site plan
Addresses
The Electricity Network Company Bicester North Sub Station Skimmingdish Lane Caversfield

Planning Applications

Application number Valid Date Application Type Location Proposal Decision Decision Issued Date
16/01727/CLUP 23/08/2016 Certificate of Lawful Use Proposed The Electricity Network Company Bicester North Sub Station Skimmingdish Lane Caversfield Oxfordshire Certificate of Lawfulness of Proposed Development for an 18km underground 132kV line between Bicester and East Claydon alongside ancillary works. Permitted 18/10/2016
16/01418/F 01/08/2016 Full Development The Electricity Network Company Bicester North Sub Station Skimmingdish Lane Caversfield Oxfordshire Construction of new electricity sub-station and access off Skimmingdish Lane Permitted 27/09/2016
15/02348/F 29/12/2015 Full Development Bicester North Sub Station Skimmingdish Lane Caversfield Oxfordshire Construction of new electricity sub-station and access off Skimmingdish Lane Application Withdrawn 23/02/2016
16/00522/DISC 07/11/2016 Discharge Of Conditions The Electricity Network Company Bicester North Sub Station Skimmingdish Lane Caversfield Oxfordshire Discharge of Conditions 18 (badgers mitigation strategy), 21 (construction environmental management plan), 22 (bat, bird, owl and invertebrate boxes) and 23 (biodiversity method statement) of 16/01418/F Permitted 24/01/2017
17/00184/DISC 13/04/2017 Discharge Of Conditions The Electricity Network Company Bicester North Sub Station Skimmingdish Lane Caversfield Oxfordshire Discharge of Conditions 3 (external wall and roof details), 4 (enclosure details), 5 (means of access), 8 (surface water drainage scheme), 9 (archaeological investigation) and 16 (tree pits) of 16/01418/F Permitted 03/07/2017
17/00134/DISC 15/03/2017 Discharge Of Conditions The Electricity Network Company Bicester North Sub Station Skimmingdish Lane Caversfield Oxfordshire Discharge of condition 19 (Removal of foliage) of 16/01418/F Permitted 18/04/2017
19/00712/F 17/04/2019 Full Development The Electricity Network Company Bicester North Sub Station Skimmingdish Lane Caversfield Oxfordshire Variation of Condition 2 (plans) 17 ('temporary contractor's compound') of 16/01418/F - Following installation of all the electrical apparatus within the substation it became clear that an additional area outside the main compound would be required to enable access for ongoing maintenance and potential future replacement of equipment. Variation to Condition 17 to allow partial retention of the external compound to allow access to the southeast area of the substation compound. Access, when required, will be gained by temporary removal of a section of the palisade fencing along the southeastern boundary. Variation to Condition 2 to substitute approved drawings 8150218-5101 Rev PA3 and CTE4002-L-02 with drawings 8150218 5101 Rev Z and CTE4002-L-02 Rev B which include an additional gravel area to the southeast of the substation. Permitted 12/06/2019

Back to top.