Planning register

Planning Application - 06/02046/CM

Skip to tab headings. Skip to tab content.

Application Number
06/02046/CM
Application Type
County Matter
Status
Observations
Decision Level
Committee
Location
Shipton-On-Cherwell Quarry Shipton-On-Cherwell Oxfordshire
Proposal
Comprehensive restoration and development of quarry
Parish
Shipton On Cherwell And Thrupp
Ward
Kirtlington
Received Date
18/10/2006
Valid Date
18/10/2006
Weekly List Date
Comments Due Date
Target Decision Date
15/11/2006
Committee Date
14/12/2006
Decision
Observations
Decision Issued Date
15/12/2006
Appeal Received Date
Appeal Start Date
Appeal Decision
Appeal Decision Date
Applicant
Kilbride Properties Ltd
Applicant's Address
Lutidine House Newark Lane Ripley Surrey GU23 6BS
Agent
Oxfordshire County Council (FAO Kevin Broughton)
Agents's Address
Environment And Economy Speedwell House Speedwell Street Oxford OX1 1NE

Written comments are publicly available and cannot be treated as confidential. Please refer to our Comment on a Planning Application page for further information. To view representations received please refer to the documents tab.


Neighbour List
No associated neighbours

Consultee List
Name Address Consult Date Reply Due Reply Received Type
NameHead Of Planning And Affordable Housing Policy AddressCherwell District Council Bodicote House White Post Road Bodicote Banbury Oxfordshire OX15 4AA Consult Date24/10/2006 Reply Due07/11/2006 Reply Received TypeStandard Consultee
NameHead Recreation And Health Improvement Manager AddressCherwell District Council Bodicote House White Post Road Bodicote Banbury Oxfordshire OX15 4AA Consult Date24/10/2006 Reply Due07/11/2006 Reply Received TypeStandard Consultee
NameHead Recreation And Health Improvement Manager AddressCherwell District Council Bodicote House White Post Road Bodicote Banbury Oxfordshire OX15 4AA Consult Date24/10/2006 Reply Due07/11/2006 Reply Received TypeStandard Consultee
Public Notices
No Public Notices

To view individual documents, click on the highlighted document title. To download a selection of individual documents, place a tick alongside each of the relevant rows and then click on Download selected files. To download all the documents, place a tick in the box alongside the header row and all the files will be selected, then click on Download selected files.

Document Type Date Description File Size Drawing/Rev Number
Supporting Documents
Reports – Miscellaneous 28/01/2011 Ecological Survey Report pt 3 (0kb) -
Reports – Miscellaneous 28/01/2011 Ecological Survey Report pt 2 (0kb) -
Reports – Miscellaneous 28/01/2011 Ecological Survey Report pt 1 (0kb) -
Reports – Miscellaneous 27/01/2011 Landscape Assessment (0kb) -
Reports – Miscellaneous 26/01/2011 Re on investigations for extension of excavation 3 (0kb) -
Reports – Miscellaneous 26/01/2011 Re on investigations for extension of excavation 2 (0kb) -
Reports – Miscellaneous 26/01/2011 Re on investigations for extension of excavation 1 (0kb) -
Reports – Miscellaneous 26/01/2011 Scoping report schedule 4 (0kb) -
Reports – Miscellaneous 26/01/2011 Scoping report plans (0kb) -
Reports – Miscellaneous 26/01/2011 Scoping report (0kb) -
Reports – Miscellaneous 19/01/2011 statement of community involvement p6 (0kb) -
Reports – Miscellaneous 19/01/2011 statement of community involvement p5 (0kb) -
Reports – Miscellaneous 19/01/2011 statement of community involvement p4 (0kb) -
Reports – Miscellaneous 19/01/2011 statement of community involvement p3 (0kb) -
Reports – Miscellaneous 19/01/2011 statement of community involvement p2 (0kb) -
Reports – Miscellaneous 19/01/2011 statement of community involvement (0kb) -
Reports – Miscellaneous 01/02/2011 Briefing on Conceptual Landform Modelling (0kb) -
Reports – Miscellaneous 01/02/2011 Hydrolocical/Hydroeological Context pt 3 (0kb) -
Reports – Miscellaneous 01/02/2011 Hydrolocical/Hydroeological Context pt 2 (0kb) -
Reports – Miscellaneous 01/02/2011 Hydrolocical/Hydroeological Context pt 1 (0kb) -
Reports – Miscellaneous 01/02/2011 Draft Report on Geological Conservation plans (0kb) -
Reports – Miscellaneous 01/02/2011 Draft Report on Geological Conservation pt (0kb) -
Reports – Miscellaneous 01/02/2011 Draft Report on Geological Conservation (0kb) -
Reports – Miscellaneous 28/01/2011 Noise/vibration monitoring (0kb) -
Reports – Miscellaneous 28/01/2011 Rail infrastructure study pt 2 (0kb) -
Reports – Miscellaneous 28/01/2011 Rail infrastructure study pt 1 (0kb) -
Reports – Miscellaneous 27/01/2011 References/Glossary (0kb) -
Reports – Miscellaneous 01/02/2011 Flood risk assessment briefing (0kb) -
Reports – Miscellaneous 27/01/2011 Visual receptor schedule (0kb) -
Reports – Miscellaneous 27/01/2011 Sognificance matrix visual effects (0kb) -
Reports – Miscellaneous 02/01/2007 Ecological Issues (0kb) -
Reports – Miscellaneous 02/01/2007 Regional Planning Committee Report (0kb) -
Supporting Documents 17/01/2011 Planning statement (0kb) -
Supporting Documents 17/01/2011 Design and Access statement (0kb) -
Site Plans
Plans – Block Plan/Site Layout 02/06/2009 A3 (0kb) -
Site Location Plan 02/06/2009 A3 site plan ariel view (0kb) -
Site Location Plan 18/10/2006 (0kb) -
Proposed Plans
Plans – Floor Plans/Elevations 19/01/2011 30-2 Proposed aggregates depot elevations (0kb) -
Plans – Floor Plans/Elevations 19/01/2011 28-2 Proposed Unit 2 elevations (0kb) -
Plans – Floor Plans/Elevations 19/01/2011 34-1 Proposed Unit 2-Floor plan (0kb) -
Plans – Floor Plans/Elevations 19/01/2011 27-2 Proposed unit 1 elevations (0kb) -
Plans – Floor Plans/Elevations 02/06/2009 A1 restored uses plan (0kb) -
Plans – Floor Plans/Elevations 18/01/2011 26-2 Proposed PDI UNit elevations (0kb) -
Plans – Floor Plans/Elevations 18/01/2011 33*1 Proposed unit floor plan (0kb) -
Plans – Landscape 17/01/2011 22-2 Landscape masterplan (0kb) -
Plans – Miscellaneous 19/01/2011 Phasing plans (0kb) -
Plans – Miscellaneous 19/01/2011 29-2 Proposed aggregates depot layer (0kb) -
Plans – Miscellaneous 17/01/2011 24-2 Proposed geological exposures (0kb) -
Plans – Miscellaneous 17/01/2011 23-2 Proposed drainage plan (0kb) -
Plans – Miscellaneous 17/01/2011 13-2 Proposed access arrangement (0kb) -
Plans – Miscellaneous 17/01/2011 21-2 Cross sections 6/7/8/9 (0kb) -
Plans – Miscellaneous 17/01/2011 20-2 cross ssections 3/4/5 (0kb) -
Plans – Miscellaneous 17/01/2011 Cross sections 1/2 19-2 (0kb) -
Plans – Miscellaneous 17/01/2011 18-2 Fill & Cut areas/cross section location (0kb) -
Plans – Miscellaneous 02/06/2009 A1 scheme of filling (0kb) -
Plans – Miscellaneous 18/01/2011 32-1 Propoosed PD! Unit floor plan (0kb) -
Plans – Miscellaneous 18/01/2011 Proposed illuminance 35-1 (0kb) -
Plans – Miscellaneous 17/01/2011 Primary contours existing levels 10-02 (0kb) -
Officer/Committee Consideration
Officer Report 02/01/2007 (0kb) -
Decision and Legal Agreements
Decision 03/08/2010 Condition 35a 26/07/10 (0kb) -
Decision 20/10/2009 Condition 35B 6/10/09 (0kb) -
Decision 20/10/2009 Condition 15/37/41/44 28/8/09 (0kb) -
Decision 02/06/2009 plan to do with decision notice (0kb) -
Decision 02/06/2009 3/4/09 (0kb) -
Planning Application Documents
5688081.tif 20/10/2009 Condition 35b (0kb) -
5688079.tif 20/10/2009 Condition 44 details (0kb) -
5688078.tif 20/10/2009 Condition 41 details (0kb) -
5688076.tif 20/10/2009 Condition 37 details (0kb) -
5562107.tif 02/06/2009 OCC Planning 24/4/09 (0kb) -
Supporting Documents
Reports – Miscellaneous (0kb) - Ecological Survey Report pt 3
Reports – Miscellaneous (0kb) - Ecological Survey Report pt 2
Reports – Miscellaneous (0kb) - Ecological Survey Report pt 1
Reports – Miscellaneous (0kb) - Landscape Assessment
Reports – Miscellaneous (0kb) - Re on investigations for extension of excavation 3
Reports – Miscellaneous (0kb) - Re on investigations for extension of excavation 2
Reports – Miscellaneous (0kb) - Re on investigations for extension of excavation 1
Reports – Miscellaneous (0kb) - Scoping report schedule 4
Reports – Miscellaneous (0kb) - Scoping report plans
Reports – Miscellaneous (0kb) - Scoping report
Reports – Miscellaneous (0kb) - statement of community involvement p6
Reports – Miscellaneous (0kb) - statement of community involvement p5
Reports – Miscellaneous (0kb) - statement of community involvement p4
Reports – Miscellaneous (0kb) - statement of community involvement p3
Reports – Miscellaneous (0kb) - statement of community involvement p2
Reports – Miscellaneous (0kb) - statement of community involvement
Reports – Miscellaneous (0kb) - Briefing on Conceptual Landform Modelling
Reports – Miscellaneous (0kb) - Hydrolocical/Hydroeological Context pt 3
Reports – Miscellaneous (0kb) - Hydrolocical/Hydroeological Context pt 2
Reports – Miscellaneous (0kb) - Hydrolocical/Hydroeological Context pt 1
Reports – Miscellaneous (0kb) - Draft Report on Geological Conservation plans
Reports – Miscellaneous (0kb) - Draft Report on Geological Conservation pt
Reports – Miscellaneous (0kb) - Draft Report on Geological Conservation
Reports – Miscellaneous (0kb) - Noise/vibration monitoring
Reports – Miscellaneous (0kb) - Rail infrastructure study pt 2
Reports – Miscellaneous (0kb) - Rail infrastructure study pt 1
Reports – Miscellaneous (0kb) - References/Glossary
Reports – Miscellaneous (0kb) - Flood risk assessment briefing
Reports – Miscellaneous (0kb) - Visual receptor schedule
Reports – Miscellaneous (0kb) - Sognificance matrix visual effects
Reports – Miscellaneous (0kb) - Ecological Issues
Reports – Miscellaneous (0kb) - Regional Planning Committee Report
Supporting Documents (0kb) - Planning statement
Supporting Documents (0kb) - Design and Access statement
Site Plans
Plans – Block Plan/Site Layout (0kb) - A3
Site Location Plan (0kb) - A3 site plan ariel view
Site Location Plan (0kb) -
Proposed Plans
Plans – Floor Plans/Elevations (0kb) - 30-2 Proposed aggregates depot elevations
Plans – Floor Plans/Elevations (0kb) - 28-2 Proposed Unit 2 elevations
Plans – Floor Plans/Elevations (0kb) - 34-1 Proposed Unit 2-Floor plan
Plans – Floor Plans/Elevations (0kb) - 27-2 Proposed unit 1 elevations
Plans – Floor Plans/Elevations (0kb) - A1 restored uses plan
Plans – Floor Plans/Elevations (0kb) - 26-2 Proposed PDI UNit elevations
Plans – Floor Plans/Elevations (0kb) - 33*1 Proposed unit floor plan
Plans – Landscape (0kb) - 22-2 Landscape masterplan
Plans – Miscellaneous (0kb) - Phasing plans
Plans – Miscellaneous (0kb) - 29-2 Proposed aggregates depot layer
Plans – Miscellaneous (0kb) - 24-2 Proposed geological exposures
Plans – Miscellaneous (0kb) - 23-2 Proposed drainage plan
Plans – Miscellaneous (0kb) - 13-2 Proposed access arrangement
Plans – Miscellaneous (0kb) - 21-2 Cross sections 6/7/8/9
Plans – Miscellaneous (0kb) - 20-2 cross ssections 3/4/5
Plans – Miscellaneous (0kb) - Cross sections 1/2 19-2
Plans – Miscellaneous (0kb) - 18-2 Fill & Cut areas/cross section location
Plans – Miscellaneous (0kb) - A1 scheme of filling
Plans – Miscellaneous (0kb) - 32-1 Propoosed PD! Unit floor plan
Plans – Miscellaneous (0kb) - Proposed illuminance 35-1
Plans – Miscellaneous (0kb) - Primary contours existing levels 10-02
Officer/Committee Consideration
Officer Report (0kb) -
Decision and Legal Agreements
Decision (0kb) - Condition 35a 26/07/10
Decision (0kb) - Condition 35B 6/10/09
Decision (0kb) - Condition 15/37/41/44 28/8/09
Decision (0kb) - plan to do with decision notice
Decision (0kb) - 3/4/09
Planning Application Documents
5688081.tif (0kb) - Condition 35b
5688079.tif (0kb) - Condition 44 details
5688078.tif (0kb) - Condition 41 details
5688076.tif (0kb) - Condition 37 details
5562107.tif (0kb) - OCC Planning 24/4/09
Addresses
Shipton Quarry Street From Shipton On Cherwell To Oxford Works Quarry Shipton On Cherwell OX5 3BA

Planning Applications

Application number Valid Date Application Type Location Proposal Decision Decision Issued Date
95/00473/CM 20/03/1995 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Phase One of the perimeter stabilisation works. Construction of earth berms to include the deposit of imported inert waste to prevent collapse of roadway. Permitted 20/10/1995
97/00154/F 20/01/1997 Full Development Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Change of use of disused quarry (part) for the storage of motor vehicles for a 10 year period inc. construction of hardstanding,fencing,and other ancillary works. Demolition of derelict buildings and works and stabilization works in quarry. Refused 25/09/1997
96/01389/CM 20/08/1996 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Variation of Condition 2 of permission 95/00473/CM for perimeter stabilisation works - Extension of time Permitted 12/08/1997
96/01010/CM 18/06/1996 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Integrated waste management centre comprising : erection of buildings, plant and equipment to provide materials recovery facility. Anaerobic digestion facility. Renewable energy bi-product to be fed into electricity network. (OUTLINE). Application Withdrawn 19/06/1997
98/00470/CM 12/03/1998 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Variation of Condition 2 of Permission 95/00473/CM for perimeter stabilisation works - Extension of time Permitted 25/06/1998
98/01701/CM 24/09/1998 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Variation of Condition 2 of Permission 95/00473/CM (extension of time by 40 weeks) -Perimeter Stabilisation Works Refused 05/02/1999
98/02053/CM 19/11/1998 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon The construction of berms by the import and deposit of inert waste to support the existing south west face Permitted 10/06/1999
99/02235/ADV 13/12/1999 Advertisement OS Parcel 3138 At Junction Of A4095 And Banbury Road Shipton-On-Cherwell Kidlington Oxon Timber framed freestanding 'V' board sign Refused 14/02/2000
00/02365/CM 23/11/2000 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Installation of inert waste recycling facility for secondary aggregates Application Withdrawn 20/06/2001
01/02331/CM 19/11/2001 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Installation of inert waste recycling facility for secondary aggregates Refused 25/01/2002
01/02216/F 31/10/2001 Telecommunications - Full Development Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Installation of Telecommunications apparatus comprising 20m lattice mast, associated equipment cabinets and fenced compound Permitted 08/02/2002
02/02602/CM 09/12/2002 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Importation of inert waste for construction of stabilisation berm and access ramp Permitted 28/03/2003
02/02330/CM 29/10/2002 County Matter Former Cement Works And Quarry Shipton-On-Cherwell Kidlington Oxon Proposed recycling Installation Objections 03/01/2003
03/01470/F 23/07/2003 Full Development Shipton On Cherwell Quarry Shipton-On-Cherwell Kidlington Oxon Installation of 1 No. 20m monopole with 4 No. antennas, 2 No. 0.6m dishes, radio equipment housing and ancillary development Permitted 19/09/2003
03/02074/F 15/10/2003 Full Development Shipton On Cherwell Quarry Shipton-On-Cherwell Kidlington Oxon Renewal and variation of application 97/00154/F to include renewal of statutory time limit condition (i), variation of condition (xix) to reflect a change in the internal access layout and removal of noise bund condition (viii). (As amended by letter dated 08.07.05.) Permitted 31/03/2006
05/00020/SO 26/05/2005 Screening Opinion Shipton On Cherwell Quarry Shipton-On-Cherwell Kidlington Oxon Screening Opinion - Redevelopment of former quarry and cement works to form new mixed use community Screening Opinion requesting EIA 15/06/2005
05/00001/SCOP 26/05/2005 Scoping Opinion Shipton On Cherwell Quarry Shipton-On-Cherwell Kidlington Oxon Scoping Opinion - Redevelopment of former quarry and cement works to form new mixed use community 30/06/2005
07/00996/CM 17/05/2007 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire Comprehensive restoration and development scheme for Shipton-On-Cherwell Quarry Objections 15/06/2007
06/02046/CM 18/10/2006 County Matter Shipton-On-Cherwell Quarry Shipton-On-Cherwell Oxfordshire Comprehensive restoration and development of quarry Observations 15/12/2006
06/00013/SO 18/10/2006 Screening Opinion Shipton-On-Cherwell Quarry Shipton-On-Cherwell Oxfordshire Screening Opinion - Comprehensive restoration and development of quarry 08/11/2006
07/02011/CM 01/10/2007 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire Comprehensive restoration and development scheme for Shipton-On-Cherwell Quarry Objections 04/01/2008
09/01180/CM 27/08/2009 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire Proposal to temporarily allow the use of the existing haul road running to the south and east of the site for the transport of minerals and waste materials to and from the site without disturbing Schedule 1 protected species currently present on the site for a period of up to 12 months or until the Little Plovers have left the iste and the construction of the new haul road through the centre of the site is completed, whichever is soonest. Objections 02/10/2009
10/00360/CM 08/03/2010 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire To continue development without complying with conditions 26 and 36 of 06/02046/CM. No Objections 21/05/2010
11/00737/CM 10/05/2011 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire Screening Opinion for the proposed operation of an Aggregates recycling facility (OCC ref. MW.0061/11) Observations 25/05/2011
11/01402/CM 15/09/2011 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire Continuation of development without complying with condition 6 (importation of waste by road) and with the variance of conditions 1 (Time Limits) and 7 (volume of waste imported) of planning permission 10/00360/CM, dated 17th June 2010 (OCC ref. MW.0120/11) Observations 04/11/2011
11/01372/CM 07/09/2011 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire The importation, storage and processing of inert construction and demolition waste, and operation of an aggregate recycling facility on land at Shipton on Cherwell Quarry. Retention of the existing weighbridge, site office and wheelwash to facilitate the operation of the proposed recycling facility (OCC ref. MW.0119/11) Objections 10/11/2011
16/00807/CM 28/04/2016 County Matter Oxford Works Quarry Shipton On Cherwell Continuation of development without complying with condition 40 (aftercare), and condition 51 (restoration) of Planning Permission 11/01402/CM (continuation of development without complying with condition 6 (importation of waste by road) and with the variance of conditions 1 (time limits) and 7 (volume of waste imported) of planning permission 10/00360/CM dated 17 June 2010 for extraction of limestone and restoration of the site by infilling for commercial, habitat creation and amenity use) in order to defer submission of restoration and aftercare details for Area A (2 years) Areas B-D (5 years). No Objections 26/05/2016
16/00013/CDISC 08/09/2016 County discharge of conditions applications Oxford Works Quarry Street From Shipton On Cherwell To Oxford Works Quarry Shipton On Cherwell Discharge of Conditions 24 (Scheme to deal with risks associated with contamination of the site) and 36 (Remedial strategy for high alkaline content stockpile) - Application 16/00807/DM (OCC Ref: MW.0046/16) No Objections 29/09/2016
16/01797/CM 26/08/2016 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Scoping opinion for proposed extension to South East (Area A) (OCC reference MW.0111/16) No Objections 23/09/2016
18/00060/CM 10/01/2018 County Matter Oxford Works Quarry Street From Shipton On Cherwell To Oxford Works Quarry Shipton On Cherwell Continuation of development without complying with condition 2 (mineral extraction cessation date) of Planning Permission no. 16/00807/CM in order to extend the period permitted for the extraction of mineral from 12th February 2017 until 31st December 2017 at Shipton-on-Cherwell Quarry No Objections 07/02/2018
18/00975/CM 30/05/2018 County Matter Oxford Works Quarry Shipton On Cherwell OX5 3BA Proposed extraction of mineral and restoration by infilling with imported inert materials to agriculture on land south east of Shipton on Cherwell Quarry (OCC Ref MW.0046/18) Objections 29/06/2018
17/00496/CNMA 01/03/2017 County Non Material Amendments Oxford Works Quarry Street From Shipton On Cherwell To Oxford Works Quarry Shipton On Cherwell Non-material amendment to the Site Office and Weighbridge Area including revised layout and additional ancillary development of planning permission 11/01372/CM (the importation, storage and processing of inert construction and demolition waste, and operation of an aggregate recycling facility on land and retention of the existing weighbridge, site office and wheelwash to facilitate the operation of the proposed recycling facility) No Objections 24/03/2017
17/00436/CM 22/02/2017 County Matter Oxford Works Quarry Street From Shipton On Cherwell To Oxford Works Quarry Shipton On Cherwell Erection of a temporary noise attenuation bund (partly retrospective) No Objections 24/03/2017
16/02609/CNMA 23/12/2016 County Non Material Amendments Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire Non-Material Amendments for 11/01372/CM - including revised layout and additional ancillary development of planning permission (MW.0145/16) No Objections 13/01/2017
16/02109/CM 19/10/2016 County Matter Oxford Works Quarry Street From Shipton On Cherwell To Oxford Works Quarry Shipton On Cherwell Removal of Condition 2 (mineral extraction cessation date) of 16/00807/CM - Extend the period permitted for the extraction of mineral from 12th February 2017 untill the 31st December 2017 No Objections 16/11/2016
19/00022/CM 07/01/2019 County Matter Oxford Works Quarry Shipton On Cherwell OX5 3BA Continuation of development without complying with condition 2 (mineral extraction cessation date) of planning permission no 18/00060/CM in order to extend the period permitted for the extraction of mineral from 31st December 2018 to 31st December 2019 at Shipton on Cherwell quarry. No Objections 04/02/2019
20/01557/OCC 16/06/2020 Deemed Regs 3 - County Council Oxford Works Quarry Shipton On Cherwell OX5 3BA Section 73 application to continue the development permitted by planning permission no. 19/00022/CM (MW.0001/19) without complying condition 1 (approved drawing), condition 2 (end date for mineral extraction), condition 39 (aftercare scheme), condition 46 (proposed limit of extraction), condition 47 (working depth), and condition 50 (restoration scheme) in order to regularise the phasing scheme; to extend the end date for mineral extraction; to enable mineral to be worked to 56 metres AOD; and to amend the dates for submission of the aftercare and restoration schemes - MW.0056/20 Objections 14/07/2020
20/02887/CM 09/10/2020 County Matter Oxford Works Quarry Shipton On Cherwell OX5 3BA Amendments to Section 73 application to continue the development permitted by planning permission no. 19/00022/CM (MW.0001/19) without complying condition 1 (approved drawing), condition 2 (end date for mineral extraction), condition 39 (aftercare scheme), condition 46 (proposed limit of extraction), condition 47 (working depth), and condition 50 (restoration scheme) in order to regularise the phasing scheme; to extend the end date for mineral extraction; to enable mineral to be worked to 56 metres AOD; and to amend the dates for submission of the aftercare and restoration schemes - MW.0056/20 (follow up to 20/01557/OCC) Objections 25/11/2020
20/03686/MISC 23/12/2020 Miscellaneous Enquiries Oxford Works Quarry Shipton On Cherwell OX5 3BA Enforcement Notice appeal for 19/00022/CM (MW.0001/19) Observations 27/01/2021
21/00618/CDISC 22/02/2021 County discharge of conditions applications Oxford Works Quarry Shipton On Cherwell OX5 3BA Details pursuant to condition Condition 39 (Aftercare Scheme) and Condition 50 (Restoration Scheme) of planning permission 19/00022/CM (MW.0001/19) - MZ.0024/21 Not proceeded with 16/09/2022
23/00776/CDISC 22/03/2023 County discharge of conditions applications Oxford Works Quarry Shipton On Cherwell OX5 3BA Details pursuant to Condition 39 (Aftercare Scheme) and Condition 50 (Restoration Scheme) of planning permission 19/00022/CM (MW.0001/19) - MW.0024/21 No Observations 02/06/2023
23/00817/CDISC 27/03/2023 County discharge of conditions applications Oxford Works Quarry Shipton On Cherwell OX5 3BA Details pursuant to Conditions 24 & 36 (contamination report and site remediation strategy) of Planning Permission 16/00807/CM (MW.0046/16) - MW.0115/16 No Observations 02/06/2023
25/00102/CM 16/01/2025 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire Section 73 application to continue the development permitted by planning permission no. 11/01372/CM (MW.0119/11) (for the importation, storage and processing of inert construction and demolition waste, and operation of an aggregate recycling facility on land at Shipton on Cherwell Quarry, Shipton on Cherwell, Oxfordshire. Retention of the existing weighbridge, site office and wheelwash to facilitate the operation of the proposed recycling facility) without complying with condition 3 (end date of the aggregate recycling facility) in order to enable the continuation of the aggregate recycling facility alongside the restoration of the quarry for further 18 months - MW.0002/25 No Observations 13/02/2025
25/00109/CM 17/01/2025 County Matter Shipton On Cherwell Quarry Shipton On Cherwell Oxfordshire Section 73 application to continue the development permitted by planning permission no. 19/00022/CM (MW.0001/19) (Demolition and recycling on site of derelict buildings, structures and works; Extraction of limestone (as aggregate and building stone) within permitted mineral extraction area; Re-establishment of rail sidings and construction of new vehicular access roads; Importation and deposit of inert materials to raise ground levels above groundwater level to facilitate quarry restoration for commercial habitat creation and amenity use; Construction of Rail Aggregate Depot on 2.6 hectares (6.5 acres) with associated concrete batching plant (class B2) and aggregate storage and ancillary structures; Change of use of 6.1 hectares (15 acres) to Rails Storage Depot comprising of storage of rail freight materials; Temporary change of use of 16.3 hectares (40.2 acres) of disused quarry to class B8 storage and distribution for motor vehicle storage for a period of 15 years operation; and erection of one temporary Class B8 storage building (to include use as motor vehicle Pre-Delivery Inspection (PDI)), including construction of hardstanding, fencing, and other ancillary works (floorspace totalling 3,716 sq.m.) for a period of 15 years operation; Permanent change of use of 2.5 hectares (6.2 acres) of disused quarry to Class B8 storage and distribution, and erection of two Class B8 storage buildings, including construction of hardstanding, fencing and other ancillary works (floorspacing totalling 7,435 sq.m); Establishment of wildlife and geological conservation and restoration areas on 35.7 ha; Change of use of 16.3 hectares (40.2 acres) of disused quarry to forestry timber cropping (after cessation of temporary B8 use); Improvements to A4260/A4095 junctions; Associated landscape and infrastructure works.) without complying with condition 5 (end date for the importation of restoration materials by road) in order to enable the continuation and completion of restoration of the quarry for further 18 months - MW.0003/25 No Observations 14/02/2025
25/00367/CM 04/02/2025 County Matter Shipton on Cherwell Quarry Shipton On Cherwell Kidlington OX5 3BA Partly retrospective winning and working of mineral, extraction of previously deposited materials, foundations and in-ground structures; partly retrospective restoration using imported inert infill material; installation of a wheel spinner and associated office; and retrospective additional HGV and staff parking areas - MW.0077/23 No Observations 04/03/2025

Back to top.