Planning register

Building Control Application: CP/GASAFE/02939/2018

Skip to tab headings. Skip to tab content.

Reference Number
CP/GASAFE/02939/2018
Application Type
Gas Safe
Status
Competent Persons Notification
Parish
Deddington
Building Surveyor
Email
Phone
Site Address
8 The Daedings Deddington Banbury OX15 0RT
Description of Works
Install a gas-fired boiler Install an unvented hot water storage vessel
Received Date
04/10/2018
Valid Date
04/10/2018
5 Week Date
08/11/2018
8 Week Date
29/11/2018
Decision
Decision Date
Commencement Date
Completion Date
04/10/2018
Applicant
Applicant's Address
Agent
MPC Plumbing & Heating Limited
Agent's Address
Approved Inspector's Insurer
Competent Persons Scheme Name
N/A
Plot Address Plot Status Commencement Date Completion Date
Work Pending

Planning Applications

Application number Valid Date Application Type Location Proposal Decision Decision Issued Date
17/00393/F 28/02/2017 Full Development 8 The Daedings Deddington Banbury OX15 0RT Demolition of existing garage and workshop and erection of two storey extension to side and single storey to rear Permitted 25/04/2017

Building Control Applications

Application number Received Date Validated Date Application Type Location Proposal
CP/FENSA/01536/2006 16/10/2006 16/10/2006 Window replacement schemes 8 The Daedings Deddington Oxfordshire OX15 0RT Replacement doors/windows
17/00627/DEXFP 09/06/2017 18/09/2017 Full Plans (Domestic Extensions) 8 The Daedings Deddington Banbury OX15 0RT Two storey extension to side and single storey to rear
CP/HETAS/00448/2017 22/06/2017 22/06/2017 Heating Equip Testing and Approval Schem 8 The Daedings Deddington Banbury OX15 0RT Installed Clearview: Pioneer Installed Liner: liner
CP/GASAFE/02939/2018 04/10/2018 04/10/2018 Gas Safe 8 The Daedings Deddington Banbury OX15 0RT Install a gas-fired boiler Install an unvented hot water storage vessel
CP/NICEIC/00185/2019 25/01/2019 25/01/2019 Competent Persons Scheme Type 8 The Daedings Deddington Banbury OX15 0RT Install one or more new circuits Install a replacement consumer unit

Back to top.