Reference Number
25/00325/BN
Application Type
Building Notice
Status
Valid Application
Parish
Bicester
Building Surveyor
Email
Phone
Site Address
39 Shearwater Drive Bicester OX26 6YR
Description of Works
Removal of internal load bearing wall.
Received Date
19/03/2025
Valid Date
04/06/2025
5 Week Date
09/07/2025
8 Week Date
30/07/2025
Decision
Decision Date
Commencement Date
Completion Date
Applicant
Kevin Whiteley
Applicant's Address
39 Shearwater Drive Bicester OX26 6YR
Agent
N/A
Agent's Address
N/A
Approved Inspector's Insurer
Competent Persons Scheme Name
N/A
Plot Address Plot Status Commencement Date Completion Date
Work Pending

Planning Applications

Application number Valid Date Application Type Location Proposal Decision Decision Issued Date
06/01402/F 13/07/2006 Full Development 39 Shearwater Drive Bicester Oxfordshire OX26 6YR First floor side extension. Conservatory to the rear Permitted 07/09/2006

Building Control Applications

Application number Received Date Validated Date Application Type Location Proposal
CP/CORGI/01254/2008 23/02/2008 23/02/2008 Council for Registered Gas Installers 39 Shearwater Drive Bicester Oxfordshire OX26 6YR Installed a Gas Fire
06/01101/DEXFP 19/09/2006 20/09/2006 Full Plans (Domestic Extensions) 39 Shearwater Drive Bicester Oxfordshire OX26 6YR Extension at first floor level forming new bedroom. Conservatory
24/45900/CP 06/10/2024 04/10/2024 Competent Persons Scheme 39 Shearwater Drive Bicester OX26 6YR Install a gas-fired boiler.
25/49387/CP 10/01/2025 06/01/2025 Competent Persons Scheme 39 Shearwater Drive Bicester OX26 6YR Install replacement doors in a dwelling.
25/50160/CP 21/02/2025 10/02/2025 Competent Persons Scheme 39 Shearwater Drive Bicester OX26 6YR Circuit alteration or addition in a special location. Install a photovoltaic system. Install one or more new circuits.
25/00325/BN 19/03/2025 04/06/2025 Building Notice 39 Shearwater Drive Bicester OX26 6YR Removal of internal load bearing wall.

Back to top.