Building Control Application: 22/00916/FP

Skip to tab headings. Skip to tab content.

Reference Number
22/00916/FP
Application Type
Full Plans
Status
Completion Certificate Issued
Parish
Banbury
Building Surveyor
Edward Antoniak
Email
edward.antoniak@cherwell-dc.gov.uk
Phone
07974 326858
Site Address
6 Forsythia Walk Banbury OX16 1YR
Description of Works
New integral garage.
Received Date
23/07/2022
Valid Date
23/07/2022
5 Week Date
27/08/2022
8 Week Date
17/09/2022
Decision
Full Plans Conditional Approval
Decision Date
02/12/2022
Commencement Date
20/04/2023
Completion Date
03/07/2024
Applicant
Mr Toby Duffield
Applicant's Address
6 Forsythia Walk Banbury OX16 1YR
Agent
N/A
Agent's Address
N/A
Approved Inspector's Insurer
Competent Persons Scheme Name
N/A
Plot Address Plot Status Commencement Date Completion Date
Work Complete 20/04/2023 03/07/2024

Planning Applications

Application number Valid Date Application Type Location Proposal Decision Decision Issued Date
21/00939/CLUP 26/04/2021 Certificate of Lawful Use Proposed 6 Forsythia Walk Banbury OX16 1YR Certificate of Lawfulness of Proposed Development for the erection of a wooden garage which will entail laying down a concrete base and building a wooden frame on top and clad in shiplap timber in keeping with the existing Refused 21/06/2021
21/04295/f 26/01/2022 Full Development 6 Forsythia Walk Banbury OX16 1YR Brick garage to be built to side of house Permitted 09/06/2022

Building Control Applications

Application number Received Date Validated Date Application Type Location Proposal
CP/GASAFE/01628/2015 06/03/2015 06/03/2015 Gas Safe 6 Forsythia Walk Banbury OX16 1YR Install a gas-fired boiler
CP/FENSA/00599/2015 02/04/2015 02/04/2015 Window replacement schemes 6 Forsythia Walk Banbury OX16 1YR Install replacement windows in a dwelling
22/00916/FP 23/07/2022 23/07/2022 Full Plans 6 Forsythia Walk Banbury OX16 1YR New integral garage.
24/41358/CP 06/08/2024 25/07/2024 Competent Persons Scheme 6 Forsythia Walk Banbury OX16 1YR Install a replacement consumer unit. Install one or more new circuits. New full electrical installation (new build).