FAO – Emily Shaw,
Case Officer
Ref –
09/00584/F
Proposal –
Variation of Condition 8 and Condition 9 of planning permission
04/02797/OUT
Location – Land
between Birmingham London Rail line and Gavray Drive,
Bicester
Thank you for your letter of
8th May 2009 providing Network Rail with an opportunity to comment on
the abovementioned application.
We have no objection in principle to
the development, however due to its close proximity to the operational railway;
we would request that the following points are taken into account if granting
the application:
OPE
Once planning
permission has been granted and at least six weeks prior to works commencing on
site the Outside Parties Engineer (OPE) MUST be contacted, contact details as below. The OPE will
require to see any method statements/drawings relating to any excavation,
drainage, demolition, lighting and building work or any works to be carried out
on site that may affect the safety, operation, integrity and access to the
railway.
DEMOLITION
Any demolition or refurbishment
works must not be carried out on the development site that may endanger the safe
operation of the railway, or the stability of the adjoining Network Rail
structures. The demolition of buildings or other structures near to the
operational railway infrastructure must be carried out in accordance with an
agreed method statement. Approval of the method statement must be obtained
from Network Rail’s Outside Parties Engineer before the development can
commence.
DRAINAGE
No water or effluent should be
discharged from the site or operations on the site into the railway undertaker's
culverts or drains, without Network Rail approval. Soakaways should not
discharge towards and/or within 10m of railway infrastructure. Details of the
proposed drainage must be submitted to, and approved by the local planning
authority; acting in consultation with the railway undertaker and the works
shall be carried out in accordance with the approved details. After the
completion and occupation of the development, any new or exacerbated problems
attributable to the new development shall be investigated and remedied at the
applicants’ expense.
FAIL SAFE USE OF
CRANE AND PLANT
All
operations, including the use of cranes or other mechanical plant working
adjacent to Network Rail’s property, must at all times be carried out in a “fail
safe” manner such that in the event of mishandling, collapse or failure, no
materials or plant are capable of falling within 3.0m of the nearest rail of the
adjacent railway line, or where the railway is electrified, within 3.0m of
overhead electrical equipment or supports.
VIBRO-IMPACT
MACHINERY
Where
vibro-compaction machinery is to be used in development, details of the use of
such machinery and a method statement should be submitted for the approval of
the Local Planning Authority acting in consultation with the railway undertaker
prior to the commencement of works and the works shall only be carried out in
accordance with the approved method statement
SCAFFOLDING
Any
scaffold which is to be constructed within 10 metres of the railway boundary
fence must be erected in such a manner that at no time will any poles over-sail
the railway and protective netting around such scaffold must be installed.
EXCAVATIONS/EARTHWORKS
All
excavations /
earthworks carried out in the vicinity of Network Rail property/ structures must
be designed and executed such that no interference with the integrity of that
property/ structure can occur. If temporary works compounds are to
be located adjacent to the operational railway, these should be included in a
method statement for approval by Network Rail. Prior to commencement of
works, full details of excavations and earthworks to be carried out near the
railway undertaker's boundary fence should be submitted for the approval of the
Local Planning Authority acting in consultation with the railway undertaker and
the works shall only be carried out in accordance with the approved details.
Where development may affect the railway, consultation with the Outside Parties
Engineer should be undertaken.
SECURITY OF
MUTUAL BOUNDARY
Security of
the railway boundary will require to be maintained at all times. If the works
require temporary or permanent alterations to the mutual boundary the applicant
must contact Network Rail’s Outside Parties Engineer.
FENCING
If not already in place, the
Developer must provide a suitable trespass proof fence (of at least 1.8m in
height) adjacent to Network Rail’s boundary and make provision for its future
maintenance and renewal. Network Rail’s existing fencing / wall must not be
removed or damaged.
METHOD
STATEMENTS/FAIL SAFE/POSSESSIONS
Method statements may require to be
submitted to Network Rail’s Outside Parties Engineer at the below address for
approval prior to works commencing on site. Where any works cannot be
carried out in a “fail-safe” manner, it will be necessary to restrict those
works to periods when the railway is closed to rail traffic i.e. “possession”
which must be booked via Network Rail’s Outside Parties Engineer and are subject
to a minimum prior notice period for booking of 20 weeks.
TWO METRE
BOUNDARY
Consideration
should be given to ensure that the construction and subsequent maintenance can
be carried out to any proposed buildings or structures without adversely
affecting the safety of, or encroaching upon Network Rail’s adjacent land, and
therefore all/any building should be situated at least 2 metres from Network Rail’s
boundary. This will allow construction and future maintenance to be
carried out from the applicant’s land, thus avoiding provision and costs of
railway look-out protection, supervision and other facilities necessary when
working from or on railway land.
LIGHTING
Any lighting associated with the
development (including vehicle lights) must not interfere with the sighting of
signalling apparatus and/or train drivers vision on approaching trains. The
location and colour of lights must not give rise to the potential for confusion
with the signalling arrangements on the railway. The developers should obtain
Network Rail’s approval of their detailed proposals regarding lighting.
Following occupation of the development, if within three months Network Rail or
a Train Operating Company has identified that lighting from the development is
interfering with driver’s vision, signal sighting, alteration/mitigation will be
required to remove the conflict at the applicant’s expense.
ACCESS TO
RAILWAY
All roads, paths or
ways providing access to any part of the railway undertaker's land shall be kept
open at all times during and after the development.
NOISE
The
potential for any noise/ vibration impacts caused by the proximity between the
proposed development and any existing railway must be assessed in the context of
PPG24 and the local planning authority should use conditions as necessary
TREES/SHRUBS/LANDSCAPING
Where trees/shrubs are to be planted
adjacent to the railway boundary these shrubs should be positioned at a minimum
distance greater than their predicted mature height from the boundary.
Certain broad leaf deciduous species should not be planted adjacent to the
railway boundary. We would wish to be involved in the approval of any
landscaping scheme adjacent to the railway. Where landscaping is proposed as
part of an application adjacent to the railway it will be necessary for details
of the landscaping to be known and approved to ensure it does not impact upon
the railway infrastructure. Any hedge planted adjacent to Network Rail’s
boundary fencing for screening purposes should be so placed that when fully
grown it does not damage the fencing or provide a means of scaling it. No
hedge should prevent Network Rail from maintaining its boundary fencing. Lists
of trees that are permitted and those that are not permitted are provided below
and these should be added to any tree planting conditions:
Permitted:
Birch (Betula), Crab Apple (Malus Sylvestris), Field Maple (Acer Campestre),
Bird Cherry (Prunus Padus), Wild Pear (Pyrs Communis), Fir Trees – Pines
(Pinus), Hawthorne (Cretaegus), Mountain Ash – Whitebeams (Sorbus), False Acacia
(Robinia), Willow Shrubs (Shrubby Salix), Thuja Plicatat
“Zebrina”
Not Permitted:
Alder (Alnus Glutinosa), Aspen –
Popular (Populus), Beech (Fagus Sylvatica), Wild Cherry (Prunus Avium), Hornbeam
(Carpinus Betulus), Small-leaved Lime (Tilia Cordata), Oak (Quercus), Willows
(Salix Willow), Sycamore – Norway Maple (Acer), Horse Chestnut (Aesculus
Hippocastanum), Sweet Chestnut (Castanea Sativa), London Plane (Platanus
Hispanica).
A comprehensive list of permitted
tree species is available upon request and any landscaping proposals must be
submitted to the Outside Parties Engineer.
ARMCO SAFETY
BARRIER
The Department of Transport
recommends the provision of a safety barrier adjacent to the railway, alongside
all roads, turning circles and parking areas where the railway is situated at or
below the level of the development. The safety barrier should be designed
to cater for specific loadings dependent on the road traffic anticipated and in
a position to stop vehicles driving into or rolling onto the railway or damage
the lineside fencing. Network Rail’s existing fencing / wall must not be removed
or damaged.
LEVEL
CROSSINGS
If there is
a level crossing in the vicinity then no part of the development shall cause any
existing level crossing road signs or traffic signals or the crossing itself to
be obscured. Clear sighting of the crossing must be maintained for the
construction/operational period and as a permanent arrangement. The same
conditions apply to the rail approaches to the level crossing. This stipulation
also includes the parking of vehicles, caravans, equipment and materials etc,
which again must not cause rail and road approach sight lines of the crossing to
be obstructed. Network Rail reserves the right to provide and maintain existing
railway signals/signs (whistle boards etc) and level crossing equipment along
any part of its railway. It should be noted that this has been the subject of
several complaints recently where householders have said that, by stopping
trains outside their houses, we are invading their privacy, and by trains
whistling creating a noise nuisance.
BRIDGE
STRIKES
Applications that are likely to
generate an increase in trips under railway bridges may be of concern to Network
Rail where there is potential for an increase in ‘Bridge strikes’. Vehicles
hitting railway bridges cause significant disruption and delay to rail users.
Consultation with the OPE is necessary to understand if there is a problem.
Developers may be asked to pay for bridge protection barriers.
ABNORMAL
LOADS
From the information supplied, it is
not clear if any abnormal loads will be using routes that include any Network
Rail assets (e.g. bridges). We would have serious reservations if during the
construction or operation of the site, abnormal loads will use routes that
include Network Rail assets. Network Rail would request that the applicant
contact our Outside Parties Engineer to confirm that any proposed route is
viable and to agree a strategy to protect our asset(s) from any potential damage
caused by abnormal loads. I would also like to advise that where any damage,
injury or delay to the rail network is caused by an abnormal load (related to
the application site), the applicant or developer will incur full liability.
CHILDRENS PLAY
AREAS/OPEN SPACES/AMENITIES
Children’s play areas,
open spaces and amenity areas must be protected by a secure fence along the
boundary of one of the following kinds, concrete post and panel, iron railings,
steel palisade or such other fence approved by the Local Planning Authority
acting in consultation with the railway undertaker to a minimum height of 2
metres and the fence should not be able to be
climbed.
TOWER
CRANES
With a development of a certain
height that may/will require use of a tower crane, the developer must bear in
mind the following. Tower crane usage adjacent to railway infrastructure is
subject to stipulations on size, capacity etc. which needs to be agreed by the
Outside Party Engineer prior to implementation.
TUNNELS
Network Rail’s Engineer is to
approve details of any development works within 15m, measured horizontally, from
the outside face of the tunnel extrados with special reference
to:
Any proposal must not interfere with
Network Rail’s operational railway not jeopardise the structural integrity of
the tunnel. The above details should be submitted to the Council and only
approved in conjunction with Network Rail.
Network Rail will not accept any
liability for any settlement, disturbance or damage caused to any development by
failure of the tunnel structures nor for any noise or vibration arising from the
normal use and/or maintenance of the tunnel. No right of support is given
or can be claimed from Network Rails tunnels or railway
land.
FORMER BR
LAND
It is incumbent upon the applicant
to investigate all the covenants and understand any restrictions relating to the
site which may take precedence over planning conditions.
Network Rail is
required to recover all reasonable costs associated with facilitating these
works
It is
realised that much of the above does not apply directly to the application but
should be taken into consideration as appropriate. Nevertheless it gives a
useful guide as to the considerations to be taken into account in relation to
development adjacent to the railway. I would advise that in particular
contacting the OPE should
be the subject of conditions, the reasons being to ensure the safety,
operational needs and integrity of the railway.
I trust full cognisance will be
taken in respect of these comments. I would be grateful if you could
inform me of the outcome of this application, forwarding a copy of the Decision
Notice to me in due course.
The method statement (if required)
will need to be agreed with:
Territory Outside
Party Engineer
Network Rail
(
11th
Floor
The Mail Box
B1
1RT
E-mail:
opelondonnorthwestern@networkrail.co.uk
Please don’t
hesitate to contact me should you have any queries.
Regards
Diane
Clarke
Town Planning Technician
LNW
Network
Rail
Desk 122, 1st
Floor
Square
One
M1
2NY
(DX716951
Tel - 0161 880
3598
Int Tel - 085
50598
diane.clarke@networkrail.co.uk
**************************************************************************************************************************************************************** The content of this email (and any attachment) is confidential. It may also be legally privileged or otherwise protected from disclosure. This email should not be used by anyone who is not an original intended recipient, nor may it be copied or disclosed to anyone who is not an original intended recipient. If you have received this email by mistake please notify us by emailing the sender, and then delete the email and any copies from your system. Liability cannot be accepted for statements made which are clearly the senders own and not made on behalf of Network Rail. Network Rail Infrastructure Limited registered in England and Wales No. 2904587, registered office Kings Place, 90 York Way London N1 9AG ****************************************************************************************************************************************************************